Solar power plant in Povorotnoye, Bilohirskyi Raion, Autonomous Republic of Crimea

Povorotnoye: 1,229 kWh per kWp a year, tilt 35° 5° east of south (PVGIS). 4.2% below the oblast median (1,284). #132 of 139 in the rayon, #1013 of 1025 in the oblast.

Bilohirsk, the rayon centre, is 15 km away. 403 m above sea level. 15 km away: Bilohirsk, the nearest bigger centre, 1,261 — 2.5% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 249 km. 8.23 m between rows, pitch 12.15 m (latitude 44.9°).

Yield of 1 kWp
1,229kWh/year
Tilt
35°5° east of south
10 kW
12,294kWh/year
Row pitch
12.15m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Povorotnoye

The designer opens with this place’s coordinates, latitude 44.9° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 249 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

51Jan65Feb95Mar121Apr137May137Jun145Jul149Aug122Sep96Oct64Nov47Dec

August: 149 kWh/kWp, December: 47 — 3.2 times less.

March: 95 against 106 in the oblast, 10.4% less.

Povorotnoye: plants, kWh
kWpA yearAugustDecember
56,147745235
1012,2941,490470
1518,4412,235705

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilohirskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.