Solar plant: site data
Solar power plant in Voronenko, Nadvirnianskyi Raion, Ivano-Frankivsk Oblast
Voronenko: 1,049 kWh per kWp a year, tilt 40° 8° east of south (PVGIS). 4.3% below the oblast median (1,097). #38 of 58 in the rayon, #626 of 700 in the oblast.
Nadvirna, the rayon centre, is 38 km away. 920 m above sea level — above 500 m the DBN snow and wind are higher. 29 km away: Verkhovyna, the nearest bigger centre, 1,074 — 2.3% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 71 km. 11.40 m between rows, pitch 15.06 m (latitude 48.3°).
- Yield of 1 kWp
- 1,049kWh/year
- Tilt
- 40°8° east of south
- 10 kW
- 10,494kWh/year
- Row pitch
- 15.06m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Voronenko
The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 71 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 117 kWh/kWp, December: 47 — 2.5 times less.
January: 57 against 46 in the oblast, 23.9% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,247 | 585 | 235 |
| 10 | 10,494 | 1,170 | 470 |
| 15 | 15,741 | 1,755 | 705 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Yablunytsia2 km1,092 kWh/kWp
- Vorokhta5 km1,053 kWh/kWp
- Lazeshchyna7 km1,065 kWh/kWp
- Tatariv8 km965 kWh/kWp
- Polianytsia8 km1,044 kWh/kWp
- Stebnyi8 km1,088 kWh/kWp
All places: Nadvirnianskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.