Solar plant: site data
Solar power plant in Stebnyi, Rakhivskyi Raion, Zakarpattia Oblast
Stebnyi: 1,088 kWh per kWp a year, tilt 39° 5° east of south (PVGIS). 4.6% below the oblast median (1,141). #12 of 36 in the rayon, #465 of 613 in the oblast.
Rakhiv, the rayon centre, is 31 km away. 732 m above sea level — above 500 m the DBN snow and wind are higher. 31 km away: Rakhiv, the nearest bigger centre, 1,068 — 1.9% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 72 km. 11.16 m between rows, pitch 14.88 m (latitude 48.3°).
- Yield of 1 kWp
- 1,088kWh/year
- Tilt
- 39°5° east of south
- 10 kW
- 10,882kWh/year
- Row pitch
- 14.88m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Stebnyi
The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 72 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 126 kWh/kWp, December: 43 — 2.9 times less.
January: 55 against 39 in the oblast, 41.0% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,441 | 630 | 215 |
| 10 | 10,882 | 1,260 | 430 |
| 15 | 16,323 | 1,890 | 645 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Chorna Tysa4 km1,072 kWh/kWp
- Lazeshchyna4 km1,065 kWh/kWp
- Yasinya5 km1,082 kWh/kWp
- Polianytsia6 km1,044 kWh/kWp
- Bukovel6 km1,056 kWh/kWp
- Yablunytsia7 km1,092 kWh/kWp
All places: Rakhivskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.