Solar plant: site data
Solar power plant in Yasinya, Rakhivskyi Raion, Zakarpattia Oblast
Yasinya: 1,082 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 5.1% below the oblast median (1,141). #13 of 36 in the rayon, #471 of 613 in the oblast.
Rakhiv, the rayon centre, is 27 km away. 650 m above sea level — above 500 m the DBN snow and wind are higher. 27 km away: Rakhiv, the nearest bigger centre, 1,068 — 1.4% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 77 km. 10.90 m between rows, pitch 14.67 m (latitude 48.3°).
- Yield of 1 kWp
- 1,082kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 10,824kWh/year
- Row pitch
- 14.67m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Yasinya
The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 77 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 126 kWh/kWp, December: 40 — 3.2 times less.
January: 53 against 39 in the oblast, 35.9% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,412 | 630 | 200 |
| 10 | 10,824 | 1,260 | 400 |
| 15 | 16,236 | 1,890 | 600 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Lazeshchyna4 km1,065 kWh/kWp
- Chorna Tysa4 km1,072 kWh/kWp
- Stebnyi5 km1,088 kWh/kWp
- Kevelovo5 km1,033 kWh/kWp
- Surdok9 km971 kWh/kWp
- Yablunytsia10 km1,092 kWh/kWp
All places: Rakhivskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.