Solar plant: site data
Solar power plant in Lazeshchyna, Rakhivskyi Raion, Zakarpattia Oblast
Lazeshchyna: 1,065 kWh per kWp a year, tilt 39° 8° east of south (PVGIS). 6.7% below the oblast median (1,141). #20 of 36 in the rayon, #500 of 613 in the oblast.
Rakhiv, the rayon centre, is 29 km away. 703 m above sea level — above 500 m the DBN snow and wind are higher. 29 km away: Rakhiv, the nearest bigger centre, the same 1,068. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 75 km. 11.14 m between rows, pitch 14.86 m (latitude 48.3°).
- Yield of 1 kWp
- 1,065kWh/year
- Tilt
- 39°8° east of south
- 10 kW
- 10,645kWh/year
- Row pitch
- 14.86m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Lazeshchyna
The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 75 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 123 kWh/kWp, December: 44 — 2.8 times less.
January: 57 against 39 in the oblast, 46.2% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,323 | 615 | 220 |
| 10 | 10,645 | 1,230 | 440 |
| 15 | 15,968 | 1,845 | 660 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Yasinya4 km1,082 kWh/kWp
- Stebnyi4 km1,088 kWh/kWp
- Yablunytsia6 km1,092 kWh/kWp
- Voronenko7 km1,049 kWh/kWp
- Chorna Tysa7 km1,072 kWh/kWp
- Polianytsia9 km1,044 kWh/kWp
All places: Rakhivskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.