Solar plant: site data
Solar power plant in Volkan, Nadvirnianskyi Raion, Ivano-Frankivsk Oblast
Volkan: 1,013 kWh per kWp a year, tilt 39° 16° east of south (PVGIS). 7.6% below the oblast median (1,097). #47 of 58 in the rayon, #671 of 700 in the oblast.
Nadvirna, the rayon centre, is 36 km away. 998 m above sea level — above 500 m the DBN snow and wind are higher. 36 km away: Nadvirna, the nearest bigger centre, 1,085 — 6.6% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 67 km. 11.25 m between rows, pitch 14.97 m (latitude 48.4°).
- Yield of 1 kWp
- 1,013kWh/year
- Tilt
- 39°16° east of south
- 10 kW
- 10,132kWh/year
- Row pitch
- 14.97m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Volkan
The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 67 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 117 kWh/kWp, December: 38 — 3.1 times less.
May: 106 against 124 in the oblast, 14.5% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,066 | 585 | 190 |
| 10 | 10,132 | 1,170 | 380 |
| 15 | 15,198 | 1,755 | 570 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Klympushi2 km1,011 kWh/kWp
- Zghary3 km1,027 kWh/kWp
- Kupene4 km1,001 kWh/kWp
- Prychil4 km988 kWh/kWp
- Bystrytsia5 km975 kWh/kWp
- Salatruk6 km1,032 kWh/kWp
All places: Nadvirnianskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.