Spain: solar plant site data

Solar power plant in Zaragoza, Spain: yield, tilt angle and row spacing

Zaragoza: 1,624 kWh per kWp a year at the optimal tilt of 38°, 2° east of south (PVGIS). 0.5% above the median of the main cities of Spain (1,615). #64 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 45.8% more here.

Zaragoza is in the province of Zaragoza, Aragon. Population 686,986 (GeoNames). 214 m above sea level. 246 km away: Valencia, the nearest bigger city, 1,632 kWh/kWp — 0.5% less here. 7.39 m between rows, pitch 11.16 m, GCR 0.43 (latitude 41.7°).

Yield of 1 kWp
1,624kWh/year
Tilt
38°2° east of south
10 kW
16,238kWh/year
Row pitch
11.16m · GCR 0.43
Rank in the country
64of 147 cities

Ground frame designer

A ground frame for a solar plant: Zaragoza

Latitude 41.7°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

103Jan121Feb144Mar147Apr158May152Jun166Jul165Aug146Sep129Oct103Nov90Dec

July: 166 kWh/kWp, December: 90 — 1.8 times less.

December: 90 against the median of 103 for the main cities of Spain, 12.6% less.

Zaragoza: plants, kWh
kWpA yearJulyDecember
58,119830450
1016,2381,660900
1524,3572,4901,350

Fixed tilt facing south

What a table yields at another tilt than the optimal 38° — for roofs and frames with a standard slope.

Zaragoza: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
38° (optimum)1,624—
15°1,520−6.4%
30°1,610−0.8%
45°1,615−0.5%
90°1,095−32.6%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.