Spain: solar plant site data

Solar power plant in Soria, Spain: yield, tilt angle and row spacing

Soria: 1,538 kWh per kWp a year at the optimal tilt of 37°, 4° east of south (PVGIS). 4.8% below the median of the main cities of Spain (1,615). #122 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 38.1% more here.

Soria is in the province of Soria, Castile and León. Population 39,112 (GeoNames). 1,064 m above sea level. 78 km away: Logroño, the nearest bigger city, 1,418 kWh/kWp — 8.5% more here. 7.26 m between rows, pitch 11.08 m, GCR 0.43 (latitude 41.8°).

Yield of 1 kWp
1,538kWh/year
Tilt
37°4° east of south
10 kW
15,381kWh/year
Row pitch
11.08m · GCR 0.43
Rank in the country
122of 147 cities

Ground frame designer

A ground frame for a solar plant: Soria

Latitude 41.8°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

99Jan105Feb129Mar135Apr147May147Jun165Jul162Aug140Sep124Oct91Nov94Dec

July: 165 kWh/kWp, November: 91 — 1.8 times less.

November: 91 against the median of 103 for the main cities of Spain, 11.7% less.

Soria: plants, kWh
kWpA yearJulyNovember
57,691825455
1015,3811,650910
1523,0722,4751,365

Fixed tilt facing south

What a table yields at another tilt than the optimal 37° — for roofs and frames with a standard slope.

Soria: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
37° (optimum)1,538—
15°1,448−5.9%
30°1,527−0.7%
45°1,528−0.7%
90°1,040−32.4%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.