Spain: solar plant site data

Solar power plant in Pamplona, Spain: yield, tilt angle and row spacing

Pamplona: 1,404 kWh per kWp a year at the optimal tilt of 36°, facing south (PVGIS). 13.1% below the median of the main cities of Spain (1,615). #128 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 26.0% more here.

Pamplona is in Navarre. Population 208,243 (GeoNames). 460 m above sea level. 84 km away: Vitoria-Gasteiz, the nearest bigger city, 1,274 kWh/kWp — 10.2% more here. 7.49 m between rows, pitch 11.36 m, GCR 0.42 (latitude 42.8°).

Yield of 1 kWp
1,404kWh/year
Tilt
36°facing south
10 kW
14,038kWh/year
Row pitch
11.36m · GCR 0.42
Rank in the country
128of 147 cities

Ground frame designer

A ground frame for a solar plant: Pamplona

Latitude 42.8°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

76Jan94Feb117Mar126Apr138May142Jun160Jul156Aug134Sep113Oct77Nov71Dec

July: 160 kWh/kWp, December: 71 — 2.3 times less.

December: 71 against the median of 103 for the main cities of Spain, 31.1% less.

Pamplona: plants, kWh
kWpA yearJulyDecember
57,019800355
1014,0381,600710
1521,0572,4001,065

Fixed tilt facing south

What a table yields at another tilt than the optimal 36° — for roofs and frames with a standard slope.

Pamplona: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
36° (optimum)1,404—
15°1,331−5.2%
30°1,397−0.5%
45°1,393−0.8%
90°944−32.8%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.