Spain: solar plant site data

Solar power plant in Bilbao, Spain: yield, tilt angle and row spacing

Bilbao: 1,171 kWh per kWp a year at the optimal tilt of 36°, 1° east of south (PVGIS). 27.5% below the median of the main cities of Spain (1,615). #146 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 5.1% more here.

Bilbao is in the province of Biscay, Basque Country. Population 347,342 (GeoNames). 20 m above sea level. 245 km away: Zaragoza, the nearest bigger city, 1,624 kWh/kWp — 27.9% less here. 7.67 m between rows, pitch 11.54 m, GCR 0.41 (latitude 43.3°).

Yield of 1 kWp
1,171kWh/year
Tilt
36°1° east of south
10 kW
11,706kWh/year
Row pitch
11.54m · GCR 0.41
Rank in the country
146of 147 cities

Ground frame designer

A ground frame for a solar plant: Bilbao

Latitude 43.3°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

64Jan77Feb102Mar110Apr121May115Jun122Jul121Aug114Sep95Oct66Nov64Dec

July: 122 kWh/kWp, January: 64 — 1.9 times less.

January: 64 against the median of 109 for the main cities of Spain, 41.3% less.

Bilbao: plants, kWh
kWpA yearJulyJanuary
55,853610320
1011,7061,220640
1517,5591,830960

Fixed tilt facing south

What a table yields at another tilt than the optimal 36° — for roofs and frames with a standard slope.

Bilbao: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
36° (optimum)1,171—
15°1,111−5.1%
30°1,165−0.5%
45°1,162−0.8%
90°804−31.4%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.