Spain: solar plant site data

Solar power plant in Santander, Spain: yield, tilt angle and row spacing

Santander: 1,198 kWh per kWp a year at the optimal tilt of 36°, 3° west of south (PVGIS). 25.8% below the median of the main cities of Spain (1,615). #141 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 7.5% more here.

Santander is in Cantabria. Population 173,635 (GeoNames). 1 m above sea level. 75 km away: Bilbao, the nearest bigger city, 1,171 kWh/kWp — 2.3% more here. 7.76 m between rows, pitch 11.63 m, GCR 0.41 (latitude 43.5°).

Yield of 1 kWp
1,198kWh/year
Tilt
36°3° west of south
10 kW
11,979kWh/year
Row pitch
11.63m · GCR 0.41
Rank in the country
141of 147 cities

Ground frame designer

A ground frame for a solar plant: Santander

Latitude 43.5°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

63Jan76Feb106Mar117Apr127May119Jun127Jul125Aug117Sep96Oct66Nov61Dec

May: 127 kWh/kWp, December: 61 — 2.1 times less.

January: 63 against the median of 109 for the main cities of Spain, 42.2% less.

Santander: plants, kWh
kWpA yearMayDecember
55,990635305
1011,9791,270610
1517,9691,905915

Fixed tilt facing south

What a table yields at another tilt than the optimal 36° — for roofs and frames with a standard slope.

Santander: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
36° (optimum)1,198—
15°1,135−5.3%
30°1,191−0.5%
45°1,188−0.8%
90°815−31.9%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.