Spain: solar plant site data

Solar power plant in Huesca, Spain: yield, tilt angle and row spacing

Huesca: 1,636 kWh per kWp a year at the optimal tilt of 39°, 2° east of south (PVGIS). 1.3% above the median of the main cities of Spain (1,615). #53 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 46.8% more here.

Huesca is in the province of Huesca, Aragon. Population 53,956 (GeoNames). 476 m above sea level. 66 km away: Zaragoza, the nearest bigger city, 1,624 kWh/kWp — 0.7% more here. 7.74 m between rows, pitch 11.46 m, GCR 0.42 (latitude 42.1°).

Yield of 1 kWp
1,636kWh/year
Tilt
39°2° east of south
10 kW
16,358kWh/year
Row pitch
11.46m · GCR 0.42
Rank in the country
53of 147 cities

Ground frame designer

A ground frame for a solar plant: Huesca

Latitude 42.1°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

104Jan124Feb147Mar147Apr157May153Jun166Jul165Aug148Sep128Oct103Nov95Dec

July: 166 kWh/kWp, December: 95 — 1.7 times less.

February: 124 against the median of 114 for the main cities of Spain, 8.8% more.

Huesca: plants, kWh
kWpA yearJulyDecember
58,179830475
1016,3581,660950
1524,5372,4901,425

Fixed tilt facing south

What a table yields at another tilt than the optimal 39° — for roofs and frames with a standard slope.

Huesca: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
39° (optimum)1,636—
15°1,525−6.8%
30°1,620−1.0%
45°1,629−0.4%
90°1,118−31.7%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.