Spain: solar plant site data

Solar power plant in Lleida, Spain: yield, tilt angle and row spacing

Lleida: 1,588 kWh per kWp a year at the optimal tilt of 37°, facing south (PVGIS). 1.7% below the median of the main cities of Spain (1,615). #98 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 42.5% more here.

Lleida is in the province of Lleida, Catalonia. Population 140,797 (GeoNames). 155 m above sea level. 76 km away: Tarragona, the nearest bigger city, 1,568 kWh/kWp — 1.3% more here. 7.21 m between rows, pitch 11.03 m, GCR 0.43 (latitude 41.6°).

Yield of 1 kWp
1,588kWh/year
Tilt
37°facing south
10 kW
15,880kWh/year
Row pitch
11.03m · GCR 0.43
Rank in the country
98of 147 cities

Ground frame designer

A ground frame for a solar plant: Lleida

Latitude 41.6°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

94Jan119Feb148Mar145Apr158May152Jun163Jul160Aug143Sep128Oct100Nov80Dec

July: 163 kWh/kWp, December: 80 — 2.0 times less.

December: 80 against the median of 103 for the main cities of Spain, 22.3% less.

Lleida: plants, kWh
kWpA yearJulyDecember
57,940815400
1015,8801,630800
1523,8202,4451,200

Fixed tilt facing south

What a table yields at another tilt than the optimal 37° — for roofs and frames with a standard slope.

Lleida: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
37° (optimum)1,588—
15°1,492−6.0%
30°1,577−0.7%
45°1,577−0.7%
90°1,064−33.0%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.