Section of the table from the Solispec engine (median zone — Cherkasy)

Yingli

Ground frame for 40 Yingli PANDA 3.0 Mini YL440CF54e/2 panels (4×10)

4 rows of 10 panels, 17.60 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
17.60kW
Steel
816.1kg
Posts
16
Bolts
290
Materials
102,440₴
Yield
20,043kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Yingli PANDA 3.0 Mini YL440CF54e/2 panel and the 4 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 100×50×2.5C-channel 100×50×2.5Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 41×41×2.5C-channel 41×41×2.5
Frames6 frames, pitch up to 2,200 mm8 frames, pitch up to 1,600 mm8 frames, pitch up to 1,600 mm
Posts121624
Footings (bored concrete)12 pcs, Ø500 mm, depth 1,500 mm16 pcs, Ø400 mm, depth 1,300 mm24 pcs, Ø350 mm, depth 1,500 mm
Concrete3.89 m³2.88 m³3.81 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,168 mm600 / 3,184 mm600 / 3,410 mm
Panel field size11,660 × 4,668 mm11,660 × 4,658 mm11,660 × 5,008 mm
Row spacing between tables (no shade on 21 December)15,590 mm at noon · 17,520 mm ±2 h17,270 mm at noon · 19,950 mm ±2 h18,930 mm at noon · 22,500 mm ±2 h
Steel691.7 kg816.1 kg893.1 kg
BoltsM10 — 162, M8 — 88M10 — 202, M8 — 88M10 — 218, M8 — 88
Panel clampsend 16, middle 72end 16, middle 72end 16, middle 72
Materials97,234 UAH102,440 UAH103,124 UAH
With installation and delivery142,181 UAH147,207 UAH148,526 UAH
Per 1 kW8,078 UAH/kW8,364 UAH/kW8,439 UAH/kW
Yield1,266 kWh/kW · 22,289 kWh/year1,139 kWh/kW · 20,043 kWh/year1,043 kWh/kW · 18,359 kWh/year
Strength σ/fy61%77%83%
Deflection / (L/200)53%61%65%
Rafter strength100%97%93%
Post utilisation48%47%56%
Utilisation97%94%94%
Depth vs frost depthokokok
Bolt utilisation38%37%20%
Plate section8%8%0%
Not includedengineer to checkengineer to checkengineer to check
Post utilisation П3——17%
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 100×50×2.5: span between posts 3 705, cantilever 1 341 mm → strength 100%.Cherkasy: Rafter C-channel 100×50×2.5: span between posts 3 705, cantilever 1 341 mm → strength 97%.Chernihiv: Rafter · Tube 60×60×2 · 3 posts, spans between posts 2 268 mm, cantilever 926 mm — continuous beam on 3 supports → strength 93%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 23.3 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 97%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 14.9 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 94%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 14.5 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 94%.
  • Stock length, mmKherson: Rafter 6 388 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 6 000, Кр1б 388 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 6 000 mm from the lower end of the rafter, where the moment is small. Bolt: 6.80 kN vs 18.00 kN (38%), plate 8%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 388 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 6 000, Кр1б 388 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 6 000 mm from the lower end of the rafter, where the moment is small. Bolt: 6.61 kN vs 18.00 kN (37%), plate 8%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 388 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 4 980, Кр1б 1 408 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 4 980 mm from the lower end of the rafter, where the moment is small. Bolt: 4.40 kN vs 22.27 kN (20%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 1 600 mm, 8 frames. Purlin C-channel 41×41×2.5: strength 83%, deflection 65% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,6578
П2Rear postTube 60×60×24,5098
Кр1аRafter (inclined beam)C-channel 100×50×2.56,0008
Кр1бRafter (inclined beam)C-channel 100×50×2.53888
Н1Rafter splice plateC-channel 100×50×2.53008
Пк1Frame strutC-channel 41×41×2.52,6208
Пк2Front frame strutC-channel 41×41×2.53,4998
Х1Longitudinal brace (cross)C-channel 41×41×2.53,0054
Р1Purlin (rail)C-channel 41×41×2.56,0004
Р2Purlin (rail)C-channel 41×41×2.56,0004
Р3Purlin (rail)C-channel 41×41×2.55,6604
Р4Purlin (rail)C-channel 41×41×2.55,6604
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——40
—Bolt M10×65 set · brace crossing——2
—Bolt M10×90 set · strut to post — through spacer inserts——8
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×120 set · purlin to rafter——64
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——40
—Bolt M10×140 set · strut to rafter — through spacer inserts——8
—Bolt M10×160 set · brace to post — through spacer inserts——4
—Bolt M10×25 set · rafter splice (plate Н1)——32
—End clamp 30 mm——16
—Mid clamp (30–40 mm)——72
—Bolt M8×50 + channel nut——88
—Concrete for 16 posts, Ø400×1300——2.88 m³

Profile cutting

51 bars of 6,000 mm, 265.1 m of profile in total.

  • Tube 60×60×212 bars
  • C-channel 100×50×2.59 bars
  • C-channel 41×41×2.530 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
102,440₴
With installation and delivery
147,207₴
Per 1 kW
8,364UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 28 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm12 bar21015,120
C-channel 100×50×2.5, stock length 6 000 mm9 bar38020,520
C-channel 41×41×2.5, stock length 6 000 mm30 bar20036,000
C-channel connector (splice plate L 300)8 pcs90720
Bolt M10×80 cl. 8.8 set — frame, struts8 pcs22176
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors32 pcs22704
Bolt M10×65 cl. 8.8 set — brace crossing2 pcs2754
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts8 pcs27216
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×120 cl. 8.8 set — purlin to rafter85 pcs272,295
Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts40 pcs271,080
Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts8 pcs27216
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1)32 pcs22704
End clamp 30 mm16 pcs35560
Mid clamp (30–40 mm)72 pcs322,304
Bolt M8×50 A2 + spring channel nut M897 pcs141,358
Post base anchor pin (M10 / rebar Ø12)16 pcs20320
Borehole casing (roofing felt / PVC, 300 mm)16 pcs60960
Crushed stone 20–40 for the bottom of the boreholes0.20 m³900180
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow33 m351,155
Module earthing clip (under the clamp)40 pcs20800
Cable clip, stainless120 pcs5600
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts2.88 m³3,80010,944
Rebar Ø10 (4 bars per post)96 m282,688
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 8 × 70 mm, 8 × 50 mm, 4 × 30 mm, 8 × 10 mm32 pcs00
Materials102,440

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 20,043 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.