Section of the table from the Solispec engine (median zone — Cherkasy)

SunPower/Maxeon

Ground frame for 40 Maxeon 6 SPR-MAX6-440 (IBC) panels (4×10)

4 rows of 10 panels, 17.60 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
17.60kW
Steel
1,197.2kg
Posts
24
Bolts
306
Materials
135,792₴
Yield
20,043kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Maxeon 6 SPR-MAX6-440 (IBC) panel and the 4 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 80×80×3Tube 80×80×3
RaftersC-channel 100×50×2.5Tube 60×60×2C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 60×40×2
Frames7 frames, pitch up to 1,690 mm8 frames, pitch up to 1,460 mm7 frames, pitch up to 1,690 mm
Posts142421
Footings (bored concrete)14 pcs, Ø450 mm, depth 1,500 mm24 pcs, Ø400 mm, depth 1,300 mm21 pcs, Ø400 mm, depth 1,500 mm
Concrete3.67 m³4.31 m³4.35 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,410 mm600 / 3,652 mm600 / 3,618 mm
Panel field size10,640 × 5,049 mm10,640 × 5,428 mm10,640 × 5,448 mm
Row spacing between tables (no shade on 21 December)16,930 mm at noon · 19,040 mm ±2 h18,760 mm at noon · 21,670 mm ±2 h20,570 mm at noon · 24,440 mm ±2 h
Steel770.0 kg1,197.2 kg1,118.9 kg
BoltsM10 — 182, M8 — 88M10 — 218, M8 — 88M10 — 196, M8 — 88
Panel clampsend 16, middle 72end 16, middle 72end 16, middle 72
Materials109,126 UAH135,792 UAH143,297 UAH
With installation and delivery153,956 UAH181,274 UAH188,062 UAH
Per 1 kW8,748 UAH/kW10,300 UAH/kW10,685 UAH/kW
Yield1,266 kWh/kW · 22,289 kWh/year1,139 kWh/kW · 20,043 kWh/year1,043 kWh/kW · 18,359 kWh/year
Strength σ/fy71%70%56%
Deflection / (L/200)59%51%37%
Rafter strength91%94%62%
Post utilisation45%19%23%
Utilisation95%95%94%
Depth vs frost depthokokok
Bolt utilisation76%18%28%
Plate section14%0%0%
Not includedengineer to checkengineer to checkengineer to check
Post utilisation П3—7%8%
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 100×50×2.5: span between posts 4 007, cantilever 1 451 mm → strength 91%.Cherkasy: Rafter · Tube 60×60×2 · 3 posts, spans between posts 2 453 mm, cantilever 1 001 mm — continuous beam on 3 supports → strength 94%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø450 × 1 500: 0.239 m³ of concrete per post. Wind uplift on the front post ≈ 19.9 kN (with γ=1.5) vs ≈ 21.1 kN (concrete weight + soil friction, estimate) → 95%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 15.1 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 95%.Chernihiv: Foundation Ø400 × 1 500: 0.188 m³ of concrete per post. Wind uplift on the front post ≈ 17.0 kN (with γ=1.5) vs ≈ 18.2 kN (concrete weight + soil friction, estimate) → 94%.
  • Stock length, mmKherson: Rafter 6 908 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 2 200, Кр1б 4 708 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 2 200 mm from the lower end of the rafter, where the moment is small. Bolt: 13.72 kN vs 18.00 kN (76%), plate 14%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 908 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 1 520, Кр1б 5 388 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 1 520 mm from the lower end of the rafter, where the moment is small. Bolt: 4.05 kN vs 22.27 kN (18%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 908 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 1 520, Кр1б 5 388 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 1 520 mm from the lower end of the rafter, where the moment is small. Bolt: 5.01 kN vs 18.00 kN (28%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 80×80×32,5248
П2Rear postTube 80×80×34,9778
П3Middle postTube 80×80×33,7518
Кр1аRafter (inclined beam)Tube 60×60×21,5208
Кр1бRafter (inclined beam)Tube 60×60×25,3888
Н1Rafter splice plateTube 60×60×23008
Пк1Frame strutC-channel 41×41×2.53,0348
Пк2Front frame strutC-channel 41×41×2.51,9398
Х1Longitudinal brace (cross)C-channel 41×41×2.53,3434
Р1Purlin (rail)C-channel 41×41×2.56,0004
Р2Purlin (rail)C-channel 41×41×2.56,0004
Р3Purlin (rail)C-channel 41×41×2.54,6404
Р4Purlin (rail)C-channel 41×41×2.54,6404
—Bolt M10×160 / M10×80 set · frame and struts / purlins, braces, connectors——178
—Bolt M10×120 set · brace to post — through spacer inserts——4
—Bolt M10×180 set · brace to post — through spacer inserts——4
—Bolt M10×140 set · rafter splice (plate Н1)——32
—End clamp 40 mm——16
—Mid clamp (30–40 mm)——72
—Bolt M8×60 + channel nut——88
—Concrete for 24 posts, Ø400×1300——4.31 m³

Profile cutting

59 bars of 6,000 mm, 286.0 m of profile in total.

  • Tube 80×80×320 bars
  • Tube 60×60×211 bars
  • C-channel 41×41×2.528 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
135,792₴
With installation and delivery
181,274₴
Per 1 kW
10,300UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 23 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 80×80×3, stock length 6 000 mm20 bar42050,400
Tube 60×60×2, stock length 6 000 mm11 bar21013,860
C-channel 41×41×2.5, stock length 6 000 mm28 bar20033,600
C-channel connector (splice plate L 300)8 pcs90720
Bolt M10×160 cl. 8.8 set — frame, struts80 pcs221,760
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors120 pcs222,640
Bolt M10×120 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×180 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×140 cl. 8.8 set — rafter splice (plate Н1)32 pcs22704
End clamp 40 mm16 pcs35560
Mid clamp (30–40 mm)72 pcs322,304
Bolt M8×60 A2 + spring channel nut M897 pcs141,358
Post base anchor pin (M10 / rebar Ø12)24 pcs20480
Borehole casing (roofing felt / PVC, 300 mm)24 pcs601,440
Crushed stone 20–40 for the bottom of the boreholes0.30 m³900270
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow32 m351,120
Module earthing clip (under the clamp)40 pcs20800
Cable clip, stainless120 pcs5600
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts4.31 m³3,80016,378
Rebar Ø10 (4 bars per post)144 m284,032
Spacer inserts / packs — pieces of the same profile (from offcuts): 16 × 80 mm, 4 × 61 mm, 4 × 20 mm24 pcs00
Materials135,792

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 20,043 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.