2 rows of 20 panels, 17.60 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
17.60kW
Steel
568.3kg
Posts
20
Bolts
242
Materials
76,299₴
Yield
20,043kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Maxeon 6 SPR-MAX6-440 (IBC) panel and the 2 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames10 frames, pitch up to 2,280 mm10 frames, pitch up to 2,280 mm10 frames, pitch up to 2,280 mm
Posts202020
Footings (bored concrete)20 pcs, Ø350 mm, depth 1,100 mm20 pcs, Ø300 mm, depth 1,300 mm20 pcs, Ø300 mm, depth 1,300 mm
Concrete2.33 m³2.02 m³2.02 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,916 mm600 / 1,916 mm600 / 1,916 mm
Panel field size21,160 × 2,459 mm21,160 × 2,459 mm21,160 × 2,459 mm
Row spacing between tables (no shade on 21 December)8,450 mm at noon · 9,500 mm ±2 h9,360 mm at noon · 10,810 mm ±2 h10,260 mm at noon · 12,190 mm ±2 h
Steel553.9 kg568.3 kg568.3 kg
BoltsM10 — 158, M8 — 84M10 — 158, M8 — 84M10 — 158, M8 — 84
Panel clampsend 8, middle 76end 8, middle 76end 8, middle 76
Materials77,074 UAH76,299 UAH76,299 UAH
With installation and delivery122,034 UAH121,259 UAH121,259 UAH
Per 1 kW6,934 UAH/kW6,890 UAH/kW6,890 UAH/kW
Yield1,266 kWh/kW · 22,289 kWh/year1,139 kWh/kW · 20,043 kWh/year1,043 kWh/kW · 18,359 kWh/year
Strength σ/fy66%90%97%
Deflection / (L/200)59%81%87%
Rafter strength66%91%98%
Post utilisation13%18%20%
Utilisation98%87%85%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 11.2 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 98%.Cherkasy: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.8 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 87%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.5 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 85%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 280 mm, 10 frames. Purlin C-channel 60×40×2: strength 90%, deflection 81% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 280 mm, 10 frames. Purlin C-channel 60×40×2: strength 97%, deflection 87% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 812, cantilever 656 mm → strength 91%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 812, cantilever 656 mm → strength 98%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,33510
П2Rear postTube 60×60×23,24110
Кр1Rafter (inclined beam)C-channel 60×40×23,12410
Пк1Frame strutC-channel 60×40×21,49510
Х1Longitudinal brace (cross)C-channel 60×40×22,6344
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×26,0002
Р6Purlin (rail)C-channel 60×40×26,0002
Р7Purlin (rail)C-channel 60×40×23,1602
Р8Purlin (rail)C-channel 60×40×23,1602
—Bolt M10×25 set · purlins, braces, connectors——50
—Bolt M10×80 set · purlin to rafter——40
—Bolt M10×90 set · strut to post — through spacer inserts——10
—Bolt M10×130 set · post–rafter — through spacer inserts——40
—Bolt M10×140 set · strut to rafter — through spacer inserts——10
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 40 mm——8
—Mid clamp (30–40 mm)——76
—Bolt M8×60 + channel nut——84
—Concrete for 20 posts, Ø300×1300——2.02 m³

Profile cutting

36 bars of 6,000 mm, 197.1 m of profile in total.

  • Tube 60×60×210 bars
  • C-channel 60×40×226 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
76,299₴
With installation and delivery
121,259₴
Per 1 kW
6,890UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 20,043 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.