Section of the table from the Solispec engine (median zone — Cherkasy)

SunPower/Maxeon

Ground frame for 30 Maxeon 6 SPR-MAX6-440 (IBC) panels (2×15)

2 rows of 15 panels, 13.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
13.20kW
Steel
437.0kg
Posts
16
Bolts
186
Materials
58,358₴
Yield
15,032kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Maxeon 6 SPR-MAX6-440 (IBC) panel and the 2 × 15 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames8 frames, pitch up to 2,180 mm8 frames, pitch up to 2,180 mm8 frames, pitch up to 2,180 mm
Posts161616
Footings (bored concrete)16 pcs, Ø400 mm, depth 900 mm16 pcs, Ø300 mm, depth 1,100 mm16 pcs, Ø300 mm, depth 1,300 mm
Concrete1.99 m³1.37 m³1.62 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,916 mm600 / 1,916 mm600 / 1,916 mm
Panel field size15,900 × 2,459 mm15,900 × 2,459 mm15,900 × 2,459 mm
Row spacing between tables (no shade on 21 December)8,450 mm at noon · 9,500 mm ±2 h9,360 mm at noon · 10,810 mm ±2 h10,260 mm at noon · 12,190 mm ±2 h
Steel425.5 kg437.0 kg448.5 kg
BoltsM10 — 122, M8 — 64M10 — 122, M8 — 64M10 — 122, M8 — 64
Panel clampsend 8, middle 56end 8, middle 56end 8, middle 56
Materials59,171 UAH58,358 UAH59,644 UAH
With installation and delivery93,231 UAH92,418 UAH93,704 UAH
Per 1 kW7,063 UAH/kW7,001 UAH/kW7,099 UAH/kW
Yield1,266 kWh/kW · 16,717 kWh/year1,139 kWh/kW · 15,032 kWh/year1,043 kWh/kW · 13,769 kWh/year
Strength σ/fy60%82%89%
Deflection / (L/200)52%71%76%
Rafter strength63%87%93%
Post utilisation13%18%19%
Utilisation98%99%82%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 900: 0.113 m³ of concrete per post. Wind uplift on the front post ≈ 10.7 kN (with γ=1.5) vs ≈ 10.9 kN (concrete weight + soil friction, estimate) → 98%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.3 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 99%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.1 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 82%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 180 mm, 8 frames. Purlin C-channel 60×40×2: strength 82%, deflection 71% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 180 mm, 8 frames. Purlin C-channel 60×40×2: strength 89%, deflection 76% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 812, cantilever 656 mm → strength 87%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 812, cantilever 656 mm → strength 93%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1358
П2Rear postTube 60×60×23,0418
Кр1Rafter (inclined beam)C-channel 60×40×23,1248
Пк1Frame strutC-channel 60×40×21,4958
Х1Longitudinal brace (cross)C-channel 60×40×22,5464
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×23,9002
Р6Purlin (rail)C-channel 60×40×23,9002
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×80 set · purlin to rafter——32
—Bolt M10×90 set · strut to post — through spacer inserts——8
—Bolt M10×130 set · post–rafter — through spacer inserts——32
—Bolt M10×140 set · strut to rafter — through spacer inserts——8
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 40 mm——8
—Mid clamp (30–40 mm)——56
—Bolt M8×60 + channel nut——64
—Concrete for 16 posts, Ø300×1100——1.37 m³

Profile cutting

28 bars of 6,000 mm, 152.1 m of profile in total.

  • Tube 60×60×28 bars
  • C-channel 60×40×220 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
58,358₴
With installation and delivery
92,418₴
Per 1 kW
7,001UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 15,032 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.