SunPower/Maxeon
Ground frame for 30 Maxeon 6 SPR-MAX6-440 (IBC) panels (2×15)
2 rows of 15 panels, 13.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.
- Power
- 13.20kW
- Steel
- 437.0kg
- Posts
- 16
- Bolts
- 186
- Materials
- 58,358₴
- Yield
- 15,032kWh/year
Figures for the median zone (Cherkasy); all three zones are in the table below.
Ground frame designer
Open this frame in the builder
The builder opens with the Maxeon 6 SPR-MAX6-440 (IBC) panel and the 2 × 15 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.
- No sign-up
- Snow and wind check
- Drawings and estimate
Three snow and wind zones
The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.
| Parameter | Low loadKherson · S₀ 760 · W₀ 480 | Median loadCherkasy · S₀ 1,520 · W₀ 420 | High loadChernihiv · S₀ 1,720 · W₀ 410 |
|---|---|---|---|
| Posts | Tube 60×60×2 | Tube 60×60×2 | Tube 60×60×2 |
| Rafters | C-channel 60×40×2 | C-channel 60×40×2 | C-channel 60×40×2 |
| Purlins and braces | C-channel 60×40×2 | C-channel 60×40×2 | C-channel 60×40×2 |
| Frames | 8 frames, pitch up to 2,180 mm | 8 frames, pitch up to 2,180 mm | 8 frames, pitch up to 2,180 mm |
| Posts | 16 | 16 | 16 |
| Footings (bored concrete) | 16 pcs, Ø400 mm, depth 900 mm | 16 pcs, Ø300 mm, depth 1,100 mm | 16 pcs, Ø300 mm, depth 1,300 mm |
| Concrete | 1.99 m³ | 1.37 m³ | 1.62 m³ |
| Tilt | 30° | 30° | 30° |
| Panel bottom / post top | 600 / 1,916 mm | 600 / 1,916 mm | 600 / 1,916 mm |
| Panel field size | 15,900 × 2,459 mm | 15,900 × 2,459 mm | 15,900 × 2,459 mm |
| Row spacing between tables (no shade on 21 December) | 8,450 mm at noon · 9,500 mm ±2 h | 9,360 mm at noon · 10,810 mm ±2 h | 10,260 mm at noon · 12,190 mm ±2 h |
| Steel | 425.5 kg | 437.0 kg | 448.5 kg |
| Bolts | M10 — 122, M8 — 64 | M10 — 122, M8 — 64 | M10 — 122, M8 — 64 |
| Panel clamps | end 8, middle 56 | end 8, middle 56 | end 8, middle 56 |
| Materials | 59,171 UAH | 58,358 UAH | 59,644 UAH |
| With installation and delivery | 93,231 UAH | 92,418 UAH | 93,704 UAH |
| Per 1 kW | 7,063 UAH/kW | 7,001 UAH/kW | 7,099 UAH/kW |
| Yield | 1,266 kWh/kW · 16,717 kWh/year | 1,139 kWh/kW · 15,032 kWh/year | 1,043 kWh/kW · 13,769 kWh/year |
| Strength σ/fy | 60% | 82% | 89% |
| Deflection / (L/200) | 52% | 71% | 76% |
| Rafter strength | 63% | 87% | 93% |
| Post utilisation | 13% | 18% | 19% |
| Utilisation | 98% | 99% | 82% |
| Depth vs frost depth | ok | ok | ok |
| Checks overall | with a caution | with a caution | with a caution |
Checks and cautions
Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.
- Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 900: 0.113 m³ of concrete per post. Wind uplift on the front post ≈ 10.7 kN (with γ=1.5) vs ≈ 10.9 kN (concrete weight + soil friction, estimate) → 98%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.3 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 99%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.1 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 82%.
- Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 180 mm, 8 frames. Purlin C-channel 60×40×2: strength 82%, deflection 71% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 180 mm, 8 frames. Purlin C-channel 60×40×2: strength 89%, deflection 76% of L/200 (snow on panel 1 106 Pa).
- Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 812, cantilever 656 mm → strength 87%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 812, cantilever 656 mm → strength 93%.
Bill of materials
The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.
| Mark | Part | Profile | Length, mm | Quantity |
|---|---|---|---|---|
| П1 | Front post | Tube 60×60×2 | 2,135 | 8 |
| П2 | Rear post | Tube 60×60×2 | 3,041 | 8 |
| Кр1 | Rafter (inclined beam) | C-channel 60×40×2 | 3,124 | 8 |
| Пк1 | Frame strut | C-channel 60×40×2 | 1,495 | 8 |
| Х1 | Longitudinal brace (cross) | C-channel 60×40×2 | 2,546 | 4 |
| Р1 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р2 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р3 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р4 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р5 | Purlin (rail) | C-channel 60×40×2 | 3,900 | 2 |
| Р6 | Purlin (rail) | C-channel 60×40×2 | 3,900 | 2 |
| — | Bolt M10×25 set · purlins, braces, connectors | — | — | 34 |
| — | Bolt M10×80 set · purlin to rafter | — | — | 32 |
| — | Bolt M10×90 set · strut to post — through spacer inserts | — | — | 8 |
| — | Bolt M10×130 set · post–rafter — through spacer inserts | — | — | 32 |
| — | Bolt M10×140 set · strut to rafter — through spacer inserts | — | — | 8 |
| — | Bolt M10×150 set · brace to post — through spacer inserts | — | — | 8 |
| — | End clamp 40 mm | — | — | 8 |
| — | Mid clamp (30–40 mm) | — | — | 56 |
| — | Bolt M8×60 + channel nut | — | — | 64 |
| — | Concrete for 16 posts, Ø300×1100 | — | — | 1.37 m³ |
Profile cutting
28 bars of 6,000 mm, 152.1 m of profile in total.
- Tube 60×60×28 bars
- C-channel 60×40×220 bars
Estimated cost
The engine's materials estimate for the median zone (Cherkasy).
- Materials
- 58,358₴
- With installation and delivery
- 92,418₴
- Per 1 kW
- 7,001UAH/kW
The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.
Yield
Yield: 1,139 kWh per 1 kW a year, ≈ 15,032 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).
A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.