Section of the table from the Solispec engine (median zone — Cherkasy)

SunPower/Maxeon

Ground frame for 20 Maxeon 6 SPR-MAX6-440 (IBC) panels (2×10)

2 rows of 10 panels, 8.80 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
8.80kW
Steel
319.5kg
Posts
12
Bolts
130
Materials
43,803₴
Yield
10,021kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Maxeon 6 SPR-MAX6-440 (IBC) panel and the 2 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames5 frames, pitch up to 2,470 mm6 frames, pitch up to 2,010 mm6 frames, pitch up to 2,010 mm
Posts101212
Footings (bored concrete)10 pcs, Ø400 mm, depth 1,100 mm12 pcs, Ø300 mm, depth 1,100 mm12 pcs, Ø300 mm, depth 1,300 mm
Concrete1.52 m³1.03 m³1.21 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,916 mm600 / 1,916 mm600 / 1,916 mm
Panel field size10,640 × 2,459 mm10,640 × 2,459 mm10,640 × 2,459 mm
Row spacing between tables (no shade on 21 December)8,450 mm at noon · 9,500 mm ±2 h9,360 mm at noon · 10,810 mm ±2 h10,260 mm at noon · 12,190 mm ±2 h
Steel293.0 kg319.5 kg328.1 kg
BoltsM10 — 76, M8 — 44M10 — 86, M8 — 44M10 — 86, M8 — 44
Panel clampsend 8, middle 36end 8, middle 36end 8, middle 36
Materials42,235 UAH43,803 UAH44,739 UAH
With installation and delivery65,405 UAH66,940 UAH67,876 UAH
Per 1 kW7,432 UAH/kW7,607 UAH/kW7,713 UAH/kW
Yield1,266 kWh/kW · 11,145 kWh/year1,139 kWh/kW · 10,021 kWh/year1,043 kWh/kW · 9,180 kWh/year
Strength σ/fy77%70%75%
Deflection / (L/200)75%55%59%
Rafter strength72%80%86%
Post utilisation14%16%17%
Utilisation91%91%75%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.1 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 91%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.6 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 91%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 812, cantilever 656 mm → strength 80%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 812, cantilever 656 mm → strength 86%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1356
П2Rear postTube 60×60×23,0416
Кр1Rafter (inclined beam)C-channel 60×40×23,1246
Пк1Frame strutC-channel 60×40×21,4956
Х1Longitudinal brace (cross)C-channel 60×40×22,3994
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×24,6402
Р4Purlin (rail)C-channel 60×40×24,6402
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×80 set · purlin to rafter——24
—Bolt M10×90 set · strut to post — through spacer inserts——6
—Bolt M10×130 set · post–rafter — through spacer inserts——24
—Bolt M10×140 set · strut to rafter — through spacer inserts——6
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 40 mm——8
—Mid clamp (30–40 mm)——36
—Bolt M8×60 + channel nut——44
—Concrete for 12 posts, Ø300×1100——1.03 m³

Profile cutting

21 bars of 6,000 mm, 110.9 m of profile in total.

  • Tube 60×60×26 bars
  • C-channel 60×40×215 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
43,803₴
With installation and delivery
66,940₴
Per 1 kW
7,607UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 10,021 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×10 layout with other panels

Next