Section of the table from the Solispec engine (median zone — Cherkasy)

Aiko

Ground frame for 30 Aiko Neostar 2P AIKO-A460-MAH54Mw panels (2×15)

2 rows of 15 panels, 13.80 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
13.80kW
Steel
469.7kg
Posts
16
Bolts
186
Materials
57,588₴
Yield
15,715kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Aiko Neostar 2P AIKO-A460-MAH54Mw panel and the 2 × 15 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames8 frames, pitch up to 2,390 mm8 frames, pitch up to 2,390 mm8 frames, pitch up to 2,390 mm
Posts161616
Footings (bored concrete)16 pcs, Ø400 mm, depth 900 mm16 pcs, Ø300 mm, depth 1,100 mm16 pcs, Ø300 mm, depth 1,300 mm
Concrete1.99 m³1.37 m³1.62 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,834 mm600 / 1,834 mm600 / 1,834 mm
Panel field size17,430 × 2,317 mm17,430 × 2,317 mm17,430 × 2,317 mm
Row spacing between tables (no shade on 21 December)7,930 mm at noon · 8,920 mm ±2 h8,790 mm at noon · 10,150 mm ±2 h9,630 mm at noon · 11,450 mm ±2 h
Steel458.2 kg469.7 kg481.3 kg
BoltsM10 — 122, M8 — 64M10 — 122, M8 — 64M10 — 122, M8 — 64
Panel clampsend 8, middle 56end 8, middle 56end 8, middle 56
Materials58,401 UAH57,588 UAH58,874 UAH
With installation and delivery94,321 UAH93,508 UAH94,794 UAH
Per 1 kW6,835 UAH/kW6,776 UAH/kW6,869 UAH/kW
Yield1,266 kWh/kW · 17,477 kWh/year1,139 kWh/kW · 15,715 kWh/year1,043 kWh/kW · 14,395 kWh/year
Strength σ/fy67%92%99%
Deflection / (L/200)63%87%93%
Rafter strength40%55%59%
Post utilisation13%17%19%
Utilisation99%100%82%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 900: 0.113 m³ of concrete per post. Wind uplift on the front post ≈ 10.8 kN (with γ=1.5) vs ≈ 10.9 kN (concrete weight + soil friction, estimate) → 99%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.4 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 100%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.2 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 82%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 390 mm, 8 frames. Purlin C-channel 60×40×2: strength 92%, deflection 87% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 390 mm, 8 frames. Purlin C-channel 60×40×2: strength 99%, deflection 93% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1028
П2Rear postTube 60×60×22,9598
Кр1Rafter (inclined beam)Tube 60×60×22,9548
Пк1Frame strutC-channel 60×40×21,4238
Х1Longitudinal brace (cross)C-channel 60×40×22,6954
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×25,4302
Р6Purlin (rail)C-channel 60×40×25,4302
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——106
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——16
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——56
—Bolt M8×50 + channel nut——64
—Concrete for 16 posts, Ø300×1100——1.37 m³

Profile cutting

28 bars of 6,000 mm, 156.0 m of profile in total.

  • Tube 60×60×212 bars
  • C-channel 60×40×216 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
57,588₴
With installation and delivery
93,508₴
Per 1 kW
6,776UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm12 bar21015,120
C-channel 60×40×2, stock length 6 000 mm16 bar23022,080
C-channel connector (splice plate L 300)8 pcs90720
Bolt M10×140 cl. 8.8 set — frame, struts40 pcs22880
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors79 pcs221,738
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts16 pcs27432
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)56 pcs321,792
Bolt M8×50 A2 + spring channel nut M871 pcs14994
Post base anchor pin (M10 / rebar Ø12)16 pcs20320
Borehole casing (roofing felt / PVC, 300 mm)16 pcs60960
Crushed stone 20–40 for the bottom of the boreholes0.11 m³90099
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow39 m351,365
Module earthing clip (under the clamp)30 pcs20600
Cable clip, stainless90 pcs5450
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts1.37 m³3,8005,206
Rebar Ø10 (4 bars per post)84 m282,352
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 8 × 70 mm, 4 × 30 mm, 8 × 10 mm24 pcs00
Materials57,588

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 15,715 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×15 layout with other panels

Next