Section of the table from the Solispec engine (median zone — Cherkasy)

Aiko

Ground frame for 10 Aiko Neostar 2P AIKO-A460-MAH54Mw panels (2×5)

2 rows of 5 panels, 4.60 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
4.60kW
Steel
202.8kg
Posts
8
Bolts
74
Materials
26,201₴
Yield
5,238kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Aiko Neostar 2P AIKO-A460-MAH54Mw panel and the 2 × 5 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 41×41×2.5
Frames4 frames, pitch up to 1,780 mm4 frames, pitch up to 1,780 mm4 frames, pitch up to 1,780 mm
Posts888
Footings (bored concrete)8 pcs, Ø300 mm, depth 1,100 mm8 pcs, Ø300 mm, depth 1,100 mm8 pcs, Ø300 mm, depth 1,300 mm
Concrete0.68 m³0.68 m³0.81 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,850 mm600 / 1,850 mm600 / 1,850 mm
Panel field size5,890 × 2,308 mm5,890 × 2,308 mm5,890 × 2,308 mm
Row spacing between tables (no shade on 21 December)7,930 mm at noon · 8,920 mm ±2 h8,790 mm at noon · 10,150 mm ±2 h9,630 mm at noon · 11,450 mm ±2 h
Steel202.8 kg202.8 kg208.6 kg
BoltsM10 — 50, M8 — 24M10 — 50, M8 — 24M10 — 50, M8 — 24
Panel clampsend 8, middle 16end 8, middle 16end 8, middle 16
Materials26,201 UAH26,201 UAH26,863 UAH
With installation and delivery38,921 UAH38,921 UAH39,583 UAH
Per 1 kW8,461 UAH/kW8,461 UAH/kW8,605 UAH/kW
Yield1,266 kWh/kW · 5,826 kWh/year1,139 kWh/kW · 5,238 kWh/year1,043 kWh/kW · 4,798 kWh/year
Strength σ/fy67%92%99%
Deflection / (L/200)59%81%87%
Rafter strength46%63%68%
Post utilisation9%13%14%
Utilisation85%74%61%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.0 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 85%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 1 780 mm, 4 frames. Purlin C-channel 41×41×2.5: strength 92%, deflection 81% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 780 mm, 4 frames. Purlin C-channel 41×41×2.5: strength 99%, deflection 87% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1194
П2Rear postTube 60×60×22,9754
Кр1Rafter (inclined beam)C-channel 60×40×22,9544
Пк1Frame strutC-channel 41×41×2.51,4374
Х1Longitudinal brace (cross)C-channel 41×41×2.52,1694
Р1Purlin (rail)C-channel 41×41×2.55,8904
—Bolt M10×65 set · brace crossing——2
—Bolt M10×80 set · purlin to rafter——16
—Bolt M10×90 set · strut to post — through spacer inserts——4
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×130 set · post–rafter — through spacer inserts——16
—Bolt M10×140 set · strut to rafter — through spacer inserts——4
—Bolt M10×160 set · brace to post — through spacer inserts——4
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——16
—Bolt M8×50 + channel nut——24
—Concrete for 8 posts, Ø300×1100——0.68 m³

Profile cutting

13 bars of 6,000 mm, 70.2 m of profile in total.

  • Tube 60×60×24 bars
  • C-channel 60×40×22 bars
  • C-channel 41×41×2.57 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
26,201₴
With installation and delivery
38,921₴
Per 1 kW
8,461UAH/kW

The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 5,238 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.