SPD for a solar plant — type, In/Imax, where to install (DSTU EN 61643-11, DSTU EN 62305)

How to choose a surge protective device for a PV plant — type 1 or 2, nominal discharge current In and Imax, voltage Uc on the DC and AC side, separation distance — with a table for a 5–10 kW house, a 30 kW and a 100 kW plant.

By Solispec editorial9 min read

The DC cables from the panels to the inverter are tens of metres of conductor on the roof, and a nearby lightning strike induces a pulse in them able to break down the inverter's input. A surge protective device (SPD) diverts that pulse to earth. But "install an SPD" is not yet a decision: the type, current, voltage and place must be chosen for each side of the plant, and the choice depends on whether the building has a lightning protection system. Below is how this is done under DSTU HD 60364-7-712:2022, DSTU EN 61643-11:2016 and the DSTU EN 62305 series, with a table for three typical plants.

What the norms require

DBN V.2.5-23:2025 (cl. 8.6) requires protection against lightning and induced overvoltages with devices under DSTU EN 62305-4:2012; that is the base requirement for any electrical installation, more in the overview of the norm.

DSTU HD 60364-7-712:2022, section 712.534, says where and which SPDs go in the PV part. The key question is whether the building has an external lightning protection system (LPS). If it has, the array either keeps the separation distance from the down conductors or is bonded to the LPS; in the second case part of the lightning current can flow through the plant's circuits, so the DC side needs a type 1+2 SPD and the bonding conductor is 16 mm² Cu (cl. 712.534.101, 712.534.105). The norm is explained on the DSTU HD 60364-7-712 page.

DSTU EN 62305-3:2021 (cl. 6.3) sets the separation distance s, and DSTU EN 62305-2:2022 the risk assessment that decides whether external lightning protection is needed at all. The presence of a PV plant does not require it by itself. The series is described in the overview of DSTU EN 62305.

DSTU EN 61643-11:2016 is the standard for the devices themselves in AC networks: test classes, parameters, methods. For SPDs in the DC circuits of PV installations IEC 61643-31:2018 (EN 61643-31:2019) applies: a device on the DC side must be tested to it, not be a "repurposed" AC device.

Type 1, type 2 and what In, Imax, Iimp mean

  • Type 2 (test class II) is against induced overvoltages. Its main parameter is the nominal discharge current In: the peak of an 8/20 µs pulse the device passes 15 times in a row without a change of its characteristics. Imax is the maximum current of the same shape the device survives once; usually twice In.
  • Type 1 (class I) is against a share of the direct lightning current. Its parameter is Iimp, a 10/350 µs pulse carrying tens of times more energy than an 8/20 one of the same peak. For PV plants type 1 is made as a combined type 1+2.
  • Up is the voltage protection level at In: it must be below the impulse withstand of the inverter input. The more current through the device, the higher the voltage at its terminals, so a margin in In is also a margin in Up.
  • Uc is the maximum continuous operating voltage. On the DC side it is often written U_cpv.

Typical values from makers' datasheets: type 2 on AC, In 5–20 kA per pole, Imax 20–40 kA; type 2 on DC, In 5–20 kA, more often 15–20 kA; type 1+2, Iimp 12.5–25 kA per pole, In 20–25 kA. In low-voltage practice the lower bound is In of at least 5 kA, and for type 1+2 an Iimp of at least 12.5 kA per pole.

The voltage Uc: where it comes from on the DC and AC side

On the DC side U_cpv must be at least U_oc max, the string's open-circuit voltage on the coldest morning, not the datasheet Voc. For a 590 W panel with Voc 52.63 V and a coefficient of −0.25 %/K at −40 °C (Kyiv's climatic region) that is 61.2 V per module: 16 modules give 979 V, and a 600 V device is unusable here. The practical rule is to take U_cpv not below the inverter's maximum input voltage: then any admissible string is within it. In our catalogue, of 18 checked single-phase hybrids 12 have a 500 V input, 2 have 550 V and 4 have 600 V; three-phase hybrids have 800 V (4 models), 1000 V (15) and 1100 V (3); of 31 three-phase grid-tie inverters 22 have a 1100 V input. So for a single-phase house the 600 V class, for a three-phase plant 1000 or 1100 V, and in the second case a 1000 V device may turn out too small. The string length for a given inverter is checked by the string calculator; why frost raises the voltage is in the article on strings and frost.

On the AC side, for TN 230/400 V networks Uc is taken at least 1.1·U0 = 253 V between line and neutral (HD 60364-5-534); datasheet devices for such networks have Uc of 255–275 V.

Where to install

  • DC: at the inverter's input or in a DC box next to it. If the cable between the array and the inverter is long (section 712.534 gives a 10 m limit), a second SPD goes on the array side, in the string box.
  • AC: in the house board or the main switchboard, because the inverter is also tied to the grid, which brings its own pulses. With an LPS, type 1+2 at the service entrance.
  • The conductor to the earthing bar as short as possible, without loops. Without a short path to the main earthing terminal the SPD has nowhere to send the pulse; see the term earthing.

Selection table by plant type

The values are technical, by the datasheets of the device classes and the norms above; we name no brands or prices. The final choice of devices and places is made by the electrical design.

PlantSideSPD typeU_cI_n (8/20 µs)I_max or I_impWhere
House 5–10 kW, 1-ph, no LPSDCtype 2 (IEC 61643-31)U_cpv ≥ 600 V≥ 5 kA, typically 15–20 kAI_max 20–40 kAinverter DC input / DC box
House 5–10 kW, 1-ph, no LPSACtype 2≥ 253 V (TN)5–20 kAI_max 20–40 kAhouse board
House 5–10 kW, LPS present, s not keptDCtype 1+2U_cpv ≥ 600 V20–25 kAI_imp ≥ 12.5 kA/poleinverter DC input
House 5–10 kW, LPS present, s not keptACtype 1+2≥ 253 V20–25 kAI_imp ≥ 12.5 kA/poleservice entrance
30 kW, 3-ph, commercial roofDCtype 2 (type 1+2 if bonded to the LPS)U_cpv ≥ 1000–1100 V15–20 kAI_max 40 kAinverter DC input; string box if the cable > 10 m
30 kW, 3-ph, commercial roofACtype 2 (type 1+2 at the entrance with an LPS)≥ 253 V (L–N)20 kAI_max 40 kAmain switchboard
100 kW, 3-ph, ground or roofDCtype 2 in every string box + at the inverterU_cpv ≥ 1100 V15–20 kAI_max 40 kAstring boxes, inverter input
100 kW, 3-ph, ground or roofACtype 1+2 at the entrance, type 2 in distribution boards≥ 253 V (L–N)20–25 kAI_imp ≥ 12.5 kA/poleentrance, distribution boards

The line "s not kept" is the separation distance under DSTU EN 62305-3:2021, formula (4): s = k_i · k_c · l / k_m. For a class III LPS with one down conductor, an 8 m building and an air gap, s = 0.04 · 1 · 8 = 0.32 m. If the array is closer to the down conductor, the frame is bonded to the LPS and a type 1+2 is installed.

When the Solispec designer is told the building has lightning protection, the electrical check adds a line about the separation distance or bonding to the LPS, a type 1+2 SPD and a 16 mm² Cu conductor; without lightning protection, type 2. The report compares the DC SPD's rated voltage with the string's U_oc max and leaves the currents of the specific device to the electrical design.

Sources

  • DSTU HD 60364-7-712:2022 — electrical installations of PV systems; section 712.534 (SPD: type by the lightning protection scheme, distance to the inverter, cl. 712.534.101 and 712.534.105), Annex B (U_oc max).
  • DSTU EN 61643-11:2016 — SPDs for low-voltage AC networks: test classes I and II, In, Imax, Iimp, Up, Uc.
  • IEC 61643-31:2018 / EN 61643-31:2019 — SPDs for the DC circuits of PV installations.
  • DSTU EN 62305-2:2022, DSTU EN 62305-3:2021 (cl. 6.3, formula (4)), DSTU EN 62305-4:2012 — risk assessment, separation distance, protection against the lightning electromagnetic impulse.
  • DBN V.2.5-23:2025 (cl. 8.6) and PUE:2026 — overvoltage protection requirements and electrical installation rules.
  • HD 60364-5-534 — the SPD's Uc by the network's earthing system (1.1·U0 for TN).
  • Makers' datasheets of the inverters in the catalogue — maximum input voltage, from which the U_cpv class follows.

Frequently asked questions

Is an SPD needed on a solar plant if the building has no lightning protection?

Yes. Without an LPS type 2 on the DC and AC side is enough, against induced overvoltages from nearby strikes and switching in the grid. DBN V.2.5-23:2025 requires overvoltage protection regardless of lightning protection.

Type 1 or type 2 for a PV plant?

Type 2 if there is no external lightning protection or the array keeps the separation distance from the down conductors. Type 1+2 when the frame is bonded to the LPS: then part of the lightning current can flow through the plant's circuits.

Which In to choose for a type 2 SPD?

At least 5 kA per pole, on the DC side usually 15–20 kA. Every pulse wears the varistor a little, so a device with In 20 kA survives twice as many storms as one with 5 kA, other things equal.

Which voltage U_cpv for the DC SPD?

Not below the string's U_oc max in frost; in practice not below the inverter's maximum input voltage: 600 V for the single-phase hybrids in our catalogue, 1000 or 1100 V for three-phase ones.

Can the SPD be installed on the AC side only?

No: the DC cables on the roof are the plant's longest "antenna", and they are what induces the pulse on the inverter input. Section 712.534 of DSTU HD 60364-7-712 is about the DC side.

Does an SPD replace earthing?

No. Without a short conductor to the main earthing terminal the device has nowhere to send the pulse, and Up at its terminals grows with every metre of conductor.

The calculation is preliminary. A qualified engineer must check the system before installation.

ElectricsNorms

News and design tips

What’s new in Solispec, changes to the standards and practical tips on designing solar power systems.

What interests you

How we handle your data: privacy policy.

Ground frame designer

Design the ground frame for your solar plant

Solispec picks the profiles and posts, checks the frame against snow and wind to the DBN and prices it down to the last bolt.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate