Solar plant: site data

Solar power plant in Hoholivka, Melitopolskyi Raion, Zaporizhzhia Oblast

Hoholivka: 1,220 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.6% above the oblast median (1,212). #182 of 215 in the rayon, #334 of 972 in the oblast.

Melitopol, the rayon centre, is 58 km away. 73 m above sea level. 21 km away: Vesele, the nearest bigger centre, the same 1,216. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 102 km. 9.55 m between rows, pitch 13.42 m (latitude 47.0°).

Yield of 1 kWp
1,220kWh/year
Tilt
36°2° east of south
10 kW
12,195kWh/year
Row pitch
13.42m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Hoholivka

The designer opens with this place’s coordinates, latitude 47.0° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 102 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan57Feb101Mar122Apr142May141Jun151Jul152Aug127Sep97Oct55Nov33Dec

August: 152 kWh/kWp, December: 33 — 4.6 times less.

January: 40 against 37 in the oblast, 8.1% more.

Hoholivka: plants, kWh
kWpA yearAugustDecember
56,098760165
1012,1951,520330
1518,2932,280495

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Melitopolskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.