Solar plant: site data

Solar power plant in Zernove, Henicheskyi Raion, Kherson Oblast

Zernove: 1,221 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 2.5% below the oblast median (1,253). #160 of 167 in the rayon, #614 of 711 in the oblast.

Henichesk, the rayon centre, is 87 km away. 76 m above sea level. 19 km away: Vesele, the nearest bigger centre, the same 1,216. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 105 km. 9.52 m between rows, pitch 13.39 m (latitude 46.9°).

Yield of 1 kWp
1,221kWh/year
Tilt
36°2° east of south
10 kW
12,214kWh/year
Row pitch
13.39m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Zernove

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 105 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan57Feb101Mar122Apr142May141Jun151Jul152Aug127Sep98Oct56Nov34Dec

August: 152 kWh/kWp, December: 34 — 4.5 times less.

December: 34 against 37 in the oblast, 8.1% less.

Zernove: plants, kWh
kWpA yearAugustDecember
56,107760170
1012,2141,520340
1518,3212,280510

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.