Solar plant: site data

Solar power plant in Chekhovka, Henicheskyi Raion, Kherson Oblast

Chekhovka: 1,218 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 2.8% below the oblast median (1,253). #164 of 167 in the rayon, #635 of 711 in the oblast.

Henichesk, the rayon centre, is 90 km away. 71 m above sea level. 24 km away: Vesele, the nearest bigger centre, the same 1,216. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 106 km. 9.53 m between rows, pitch 13.40 m (latitude 47.0°).

Yield of 1 kWp
1,218kWh/year
Tilt
36°2° east of south
10 kW
12,181kWh/year
Row pitch
13.40m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Chekhovka

The designer opens with this place’s coordinates, latitude 47.0° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 106 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan56Feb101Mar122Apr142May141Jun151Jul152Aug127Sep97Oct55Nov33Dec

August: 152 kWh/kWp, December: 33 — 4.6 times less.

December: 33 against 37 in the oblast, 10.8% less.

Chekhovka: plants, kWh
kWpA yearAugustDecember
56,091760165
1012,1811,520330
1518,2722,280495

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.