Solar plant: site data

Solar power plant in Verby, Henicheskyi Raion, Kherson Oblast

Verby: 1,221 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 2.6% below the oblast median (1,253). #161 of 167 in the rayon, #620 of 711 in the oblast.

Henichesk, the rayon centre, is 84 km away. 67 m above sea level. 25 km away: Vesele, the nearest bigger centre, the same 1,216. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 110 km. 9.50 m between rows, pitch 13.37 m (latitude 46.9°).

Yield of 1 kWp
1,221kWh/year
Tilt
36°2° east of south
10 kW
12,205kWh/year
Row pitch
13.37m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Verby

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 110 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan57Feb101Mar122Apr142May141Jun151Jul151Aug127Sep98Oct55Nov34Dec

July: 151 kWh/kWp, December: 34 — 4.4 times less.

December: 34 against 37 in the oblast, 8.1% less.

Verby: plants, kWh
kWpA yearJulyDecember
56,103755170
1012,2051,510340
1518,3082,265510

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.