Poland: solar plant site data

Solar power plant in Włocławek, Poland: yield, tilt angle and row spacing

Włocławek: 1,040 kWh per kWp a year at the optimal tilt of 39°, 3° east of south (PVGIS). 2.4% below the median of the main cities of Poland (1,065). #74 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 6.7% less here.

Włocławek is in Kuyavian-Pomeranian Voivodeship. Population 120,339 (GeoNames). 58 m above sea level. 45 km away: Płock, the nearest bigger city, 1,057 kWh/kWp — 1.6% less here. 15.85 m between rows, pitch 19.57 m, GCR 0.24 (latitude 52.6°).

Yield of 1 kWp
1,040kWh/year
Tilt
39°3° east of south
10 kW
10,395kWh/year
Row pitch
19.57m · GCR 0.24
Rank in the country
74of 87 cities

Ground frame designer

A ground frame for a solar plant: Włocławek

Latitude 52.6°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan51Feb93Mar121Apr132May131Jun126Jul121Aug103Sep70Oct33Nov25Dec

May: 132 kWh/kWp, December: 25 — 5.3 times less.

December: 25 against the median of 32 for the main cities of Poland, 21.9% less.

Włocławek: plants, kWh
kWpA yearMayDecember
55,198660125
1010,3951,320250
1515,5931,980375

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Poland: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.