Poland: solar plant site data
Solar power plant in Inowrocław, Poland: yield, tilt angle and row spacing
Inowrocław: 1,066 kWh per kWp a year at the optimal tilt of 40°, 3° east of south (PVGIS). Exactly the median of the main cities of Poland (1,065). #43 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 4.3% less here.
Inowrocław is in Kuyavian-Pomeranian Voivodeship. Population 77,597 (GeoNames). 98 m above sea level. 33 km away: Torun, the nearest bigger city, 1,042 kWh/kWp — 2.3% more here. 16.43 m between rows, pitch 20.09 m, GCR 0.24 (latitude 52.8°).
- Yield of 1 kWp
- 1,066kWh/year
- Tilt
- 40°3° east of south
- 10 kW
- 10,664kWh/year
- Row pitch
- 20.09m · GCR 0.24
- Rank in the country
- 43of 87 cities
Ground frame designer
A ground frame for a solar plant: Inowrocław
Latitude 52.8°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
May: 135 kWh/kWp, December: 26 — 5.2 times less.
January: 30 against the median of 37 for the main cities of Poland, 18.9% less.
| kWp | A year | May | December |
|---|---|---|---|
| 5 | 5,332 | 675 | 130 |
| 10 | 10,664 | 1,350 | 260 |
| 15 | 15,996 | 2,025 | 390 |
Snow and wind loads
Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.
The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.
Nearby cities
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation, population and divisions (changed)
- Where to take snow and wind loads from: PN-EN 1991-1-3 + NA, PN-EN 1991-1-4 + NA
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.