Poland: solar plant site data

Solar power plant in Torun, Poland: yield, tilt angle and row spacing

Torun: 1,042 kWh per kWp a year at the optimal tilt of 40°, 4° east of south (PVGIS). 2.2% below the median of the main cities of Poland (1,065). #72 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 6.5% less here.

Torun is in Kuyavian-Pomeranian Voivodeship. Population 196,935 (GeoNames). 51 m above sea level. 41 km away: Bydgoszcz, the nearest bigger city, 1,025 kWh/kWp — 1.6% more here. 16.78 m between rows, pitch 20.44 m, GCR 0.23 (latitude 53.0°).

Yield of 1 kWp
1,042kWh/year
Tilt
40°4° east of south
10 kW
10,420kWh/year
Row pitch
20.44m · GCR 0.23
Rank in the country
72of 87 cities

Ground frame designer

A ground frame for a solar plant: Torun

Latitude 53.0°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan53Feb93Mar122Apr132May129Jun127Jul122Aug104Sep71Oct33Nov26Dec

May: 132 kWh/kWp, December: 26 — 5.1 times less.

November: 33 against the median of 41 for the main cities of Poland, 19.5% less.

Torun: plants, kWh
kWpA yearMayDecember
55,210660130
1010,4201,320260
1515,6301,980390

Fixed tilt facing south

What a table yields at another tilt than the optimal 40° — for roofs and frames with a standard slope.

Torun: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
40° (optimum)1,042—
15°971−6.9%
30°1,030−1.2%
45°1,038−0.4%
90°748−28.2%

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Poland: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.