Poland: solar plant site data

Solar power plant in Piła, Poland: yield, tilt angle and row spacing

Piła: 1,006 kWh per kWp a year at the optimal tilt of 40°, 5° east of south (PVGIS). 5.5% below the median of the main cities of Poland (1,065). #87 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 9.7% less here.

Piła is in Greater Poland Voivodeship. Population 75,532 (GeoNames). 60 m above sea level. 84 km away: Poznan, the nearest bigger city, 1,059 kWh/kWp — 5.0% less here. 17.01 m between rows, pitch 20.67 m, GCR 0.23 (latitude 53.2°).

Yield of 1 kWp
1,006kWh/year
Tilt
40°5° east of south
10 kW
10,060kWh/year
Row pitch
20.67m · GCR 0.23
Rank in the country
87of 87 cities

Ground frame designer

A ground frame for a solar plant: Piła

Latitude 53.2°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan51Feb89Mar120Apr126May127Jun126Jul116Aug100Sep67Oct31Nov23Dec

June: 127 kWh/kWp, December: 23 — 5.5 times less.

December: 23 against the median of 32 for the main cities of Poland, 28.1% less.

Piła: plants, kWh
kWpA yearJuneDecember
55,030635115
1010,0601,270230
1515,0901,905345

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Poland: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.