Poland: solar plant site data

Solar power plant in Gorzów Wielkopolski, Poland: yield, tilt angle and row spacing

Gorzów Wielkopolski: 1,045 kWh per kWp a year at the optimal tilt of 40°, 4° east of south (PVGIS). 1.9% below the median of the main cities of Poland (1,065). #69 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 6.2% less here.

Gorzów Wielkopolski is in Lubusz Voivodeship. Population 114,567 (GeoNames). 42 m above sea level. 89 km away: Szczecin, the nearest bigger city, 1,007 kWh/kWp — 3.8% more here. 16.33 m between rows, pitch 19.99 m, GCR 0.24 (latitude 52.7°).

Yield of 1 kWp
1,045kWh/year
Tilt
40°4° east of south
10 kW
10,451kWh/year
Row pitch
19.99m · GCR 0.24
Rank in the country
69of 87 cities

Ground frame designer

A ground frame for a solar plant: Gorzów Wielkopolski

Latitude 52.7°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan52Feb91Mar123Apr130May130Jun129Jul120Aug104Sep70Oct35Nov27Dec

May: 130 kWh/kWp, December: 27 — 4.8 times less.

December: 27 against the median of 32 for the main cities of Poland, 15.6% less.

Gorzów Wielkopolski: plants, kWh
kWpA yearMayDecember
55,226650135
1010,4511,300270
1515,6761,950405

Fixed tilt facing south

What a table yields at another tilt than the optimal 40° — for roofs and frames with a standard slope.

Gorzów Wielkopolski: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
40° (optimum)1,045—
15°975−6.7%
30°1,034−1.1%
45°1,041−0.4%
90°749−28.3%

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.