Poland: solar plant site data

Solar power plant in Zielona Góra, Poland: yield, tilt angle and row spacing

Zielona Góra: 1,054 kWh per kWp a year at the optimal tilt of 40°, 5° east of south (PVGIS). 1.0% below the median of the main cities of Poland (1,065). #65 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 5.4% less here.

Zielona Góra is in Lubusz Voivodeship. Population 118,433 (GeoNames). 143 m above sea level. 110 km away: Poznan, the nearest bigger city, the same 1,059 kWh/kWp. 15.16 m between rows, pitch 18.82 m, GCR 0.25 (latitude 51.9°).

Yield of 1 kWp
1,054kWh/year
Tilt
40°5° east of south
10 kW
10,539kWh/year
Row pitch
18.82m · GCR 0.25
Rank in the country
65of 87 cities

Ground frame designer

A ground frame for a solar plant: Zielona Góra

Latitude 51.9°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan55Feb91Mar120Apr127May127Jun129Jul120Aug104Sep74Oct41Nov31Dec

July: 129 kWh/kWp, December: 31 — 4.2 times less.

October: 74 against the median of 79 for the main cities of Poland, 6.3% less.

Zielona Góra: plants, kWh
kWpA yearJulyDecember
55,270645155
1010,5391,290310
1515,8091,935465

Fixed tilt facing south

What a table yields at another tilt than the optimal 40° — for roofs and frames with a standard slope.

Zielona Góra: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
40° (optimum)1,054—
15°983−6.8%
30°1,042−1.1%
45°1,050−0.4%
90°756−28.3%

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.