Poland: solar plant site data

Solar power plant in Bialystok, Poland: yield, tilt angle and row spacing

Bialystok: 1,017 kWh per kWp a year at the optimal tilt of 39°, 4° east of south (PVGIS). 4.5% below the median of the main cities of Poland (1,065). #82 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 8.7% less here.

Bialystok is in Podlaskie Voivodeship. Population 295,683 (GeoNames). 135 m above sea level. 176 km away: Warsaw, the nearest bigger city, 1,053 kWh/kWp — 3.4% less here. 16.62 m between rows, pitch 20.34 m, GCR 0.24 (latitude 53.1°).

Yield of 1 kWp
1,017kWh/year
Tilt
39°4° east of south
10 kW
10,172kWh/year
Row pitch
20.34m · GCR 0.24
Rank in the country
82of 87 cities

Ground frame designer

A ground frame for a solar plant: Bialystok

Latitude 53.1°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

30Jan50Feb89Mar115Apr130May133Jun131Jul123Aug101Sep67Oct27Nov22Dec

June: 133 kWh/kWp, December: 22 — 6.0 times less.

November: 27 against the median of 41 for the main cities of Poland, 34.1% less.

Bialystok: plants, kWh
kWpA yearJuneDecember
55,086665110
1010,1721,330220
1515,2581,995330

Fixed tilt facing south

What a table yields at another tilt than the optimal 39° — for roofs and frames with a standard slope.

Bialystok: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
39° (optimum)1,017—
15°953−6.3%
30°1,008−0.9%
45°1,013−0.4%
90°724−28.8%

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Poland: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.