Solar power plant in Suwałki, Poland: yield, tilt angle and row spacing

Suwałki: 1,018 kWh per kWp a year at the optimal tilt of 40°, 3° east of south (PVGIS). 4.4% below the median of the main cities of Poland (1,065). #81 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 8.6% less here.

Suwałki is in Podlaskie Voivodeship. Population 69,222 (GeoNames). 177 m above sea level. 110 km away: Bialystok, the nearest bigger city, the same 1,017 kWh/kWp. 18.80 m between rows, pitch 22.46 m, GCR 0.21 (latitude 54.1°).

Yield of 1 kWp
1,018kWh/year
Tilt
40°3° east of south
10 kW
10,183kWh/year
Row pitch
22.46m · GCR 0.21
Rank in the country
81of 87 cities

Ground frame designer

A ground frame for a solar plant: Suwałki

Latitude 54.1°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

29Jan50Feb92Mar120Apr133May134Jun131Jul121Aug102Sep64Oct24Nov19Dec

June: 134 kWh/kWp, December: 19 — 7.1 times less.

November: 24 against the median of 41 for the main cities of Poland, 41.5% less.

Suwałki: plants, kWh
kWpA yearJuneDecember
55,09267095
1010,1831,340190
1515,2752,010285

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.