Solar power plant in Ełk, Poland: yield, tilt angle and row spacing

Ełk: 1,012 kWh per kWp a year at the optimal tilt of 39°, 2° east of south (PVGIS). 5.0% below the median of the main cities of Poland (1,065). #85 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 9.1% less here.

Ełk is in Warmian-Masurian Voivodeship. Population 55,769 (GeoNames). 127 m above sea level. 49 km away: Suwałki, the nearest bigger city, 1,018 kWh/kWp — 0.6% less here. 17.85 m between rows, pitch 21.57 m, GCR 0.22 (latitude 53.8°).

Yield of 1 kWp
1,012kWh/year
Tilt
39°2° east of south
10 kW
10,121kWh/year
Row pitch
21.57m · GCR 0.22
Rank in the country
85of 87 cities

Ground frame designer

A ground frame for a solar plant: Ełk

Latitude 53.8°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

30Jan47Feb89Mar118Apr131May133Jun131Jul121Aug101Sep65Oct25Nov20Dec

June: 133 kWh/kWp, December: 20 — 6.7 times less.

November: 25 against the median of 41 for the main cities of Poland, 39.0% less.

Ełk: plants, kWh
kWpA yearJuneDecember
55,061665100
1010,1211,330200
1515,1821,995300

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Poland: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.