Solar plant: site data
Solar power plant in Petrovka, Simferopolskyi Raion, Autonomous Republic of Crimea
Petrovka: 1,333 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 3.8% above the oblast median (1,284). #11 of 115 in the rayon, #105 of 1025 in the oblast.
Simferopol, the rayon centre, is 26 km away. 86 m above sea level. 26 km away: Simferopol, the nearest bigger centre, 1,293 — 3.1% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 202 km. 8.46 m between rows, pitch 12.33 m (latitude 45.0°).
- Yield of 1 kWp
- 1,333kWh/year
- Tilt
- 36°1° west of south
- 10 kW
- 13,326kWh/year
- Row pitch
- 12.33m · GCR 0.39
- T_min
- -27 °Cregion V, Crimean Mountains
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Petrovka
The designer opens with this place’s coordinates, latitude 45.0° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 202 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 157 kWh/kWp, December: 50 — 3.1 times less.
November: 70 against 63 in the oblast, 11.1% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,663 | 785 | 250 |
| 10 | 13,326 | 1,570 | 500 |
| 15 | 19,989 | 2,355 | 750 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Aleksandrovka3 km1,332 kWh/kWp
- Klyuchevoye4 km1,343 kWh/kWp
- Kolodeznoye4 km1,324 kWh/kWp
- Novosyolovka5 km1,322 kWh/kWp
- Peredovoye5 km1,325 kWh/kWp
- Vinnytske5 km1,343 kWh/kWp
All places: Simferopolskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.