Solar plant: site data
Solar power plant in Peredovoye, Simferopolskyi Raion, Autonomous Republic of Crimea
Peredovoye: 1,325 kWh per kWp a year, tilt 36° facing south (PVGIS). 3.2% above the oblast median (1,284). #13 of 115 in the rayon, #154 of 1025 in the oblast.
Simferopol, the rayon centre, is 25 km away. 122 m above sea level. 25 km away: Simferopol, the nearest bigger centre, 1,293 — 2.5% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 200 km. 8.48 m between rows, pitch 12.35 m (latitude 45.1°).
- Yield of 1 kWp
- 1,325kWh/year
- Tilt
- 36°facing south
- 10 kW
- 13,252kWh/year
- Row pitch
- 12.35m · GCR 0.39
- T_min
- -27 °Cregion V, Crimean Mountains
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Peredovoye
The designer opens with this place’s coordinates, latitude 45.1° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 200 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 157 kWh/kWp, January: 50 — 3.1 times less.
November: 70 against 63 in the oblast, 11.1% more.
| kWp | A year | July | January |
|---|---|---|---|
| 5 | 6,626 | 785 | 250 |
| 10 | 13,252 | 1,570 | 500 |
| 15 | 19,878 | 2,355 | 750 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Skvortsovo3 km1,312 kWh/kWp
- Kolodeznoye3 km1,324 kWh/kWp
- Petrovka5 km1,333 kWh/kWp
- Zhavoronki6 km1,319 kWh/kWp
- Shkilne6 km1,297 kWh/kWp
- Mezhgornoye6 km1,305 kWh/kWp
All places: Simferopolskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.