Solar plant: site data

Solar power plant in Shkilne, Simferopolskyi Raion, Autonomous Republic of Crimea

Shkilne: 1,297 kWh per kWp a year, tilt 35° 1° east of south (PVGIS). 1.0% above the oblast median (1,284). #46 of 115 in the rayon, #376 of 1025 in the oblast.

Simferopol, the rayon centre, is 20 km away. 132 m above sea level. 20 km away: Simferopol, the nearest bigger centre, the same 1,293. Snow and wind from the nearest regional centre in the DBN — Херсон, 202 km. 8.28 m between rows, pitch 12.20 m (latitude 45.1°).

Yield of 1 kWp
1,297kWh/year
Tilt
35°1° east of south
10 kW
12,968kWh/year
Row pitch
12.20m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Shkilne

The designer opens with this place’s coordinates, latitude 45.1° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 202 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan63Feb105Mar131Apr146May144Jun154Jul155Aug131Sep104Oct68Nov48Dec

August: 155 kWh/kWp, January: 48 — 3.2 times less.

November: 68 against 63 in the oblast, 7.9% more.

Shkilne: plants, kWh
kWpA yearAugustJanuary
56,484775240
1012,9681,550480
1519,4522,325720

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Simferopolskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.