Solar plant: site data

Solar power plant in Aleksandrovka, Simferopolskyi Raion, Autonomous Republic of Crimea

Aleksandrovka: 1,332 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 3.7% above the oblast median (1,284). #12 of 115 in the rayon, #110 of 1025 in the oblast.

Simferopol, the rayon centre, is 29 km away. 82 m above sea level. 29 km away: Simferopol, the nearest bigger centre, 1,293 — 3.0% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 202 km. 8.46 m between rows, pitch 12.33 m (latitude 45.0°).

Yield of 1 kWp
1,332kWh/year
Tilt
36°1° west of south
10 kW
13,318kWh/year
Row pitch
12.33m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Aleksandrovka

The designer opens with this place’s coordinates, latitude 45.0° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 202 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

51Jan68Feb108Mar133Apr148May146Jun157Jul157Aug134Sep108Oct71Nov51Dec

July: 157 kWh/kWp, January: 51 — 3.1 times less.

December: 51 against 45 in the oblast, 13.3% more.

Aleksandrovka: plants, kWh
kWpA yearJulyJanuary
56,659785255
1013,3181,570510
1519,9772,355765

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Simferopolskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.