Solar plant: site data
Solar power plant in Frontovoye, Kerchenskyi Raion, Autonomous Republic of Crimea
Frontovoye: 1,310 kWh per kWp a year, tilt 35° 4° west of south (PVGIS). 2.0% above the oblast median (1,284). #29 of 71 in the rayon, #272 of 1025 in the oblast.
Kerch, the rayon centre, is 82 km away. 29 m above sea level. 19 km away: Feodosiya, the nearest bigger centre, 1,277 — 2.6% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 272 km. 8.35 m between rows, pitch 12.27 m (latitude 45.2°).
- Yield of 1 kWp
- 1,310kWh/year
- Tilt
- 35°4° west of south
- 10 kW
- 13,098kWh/year
- Row pitch
- 12.27m · GCR 0.39
- T_min
- -27 °Cregion V, Crimean Mountains
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Frontovoye
The designer opens with this place’s coordinates, latitude 45.2° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 272 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 160 kWh/kWp, January: 45 — 3.6 times less.
January: 45 against 47 in the oblast, 4.3% less.
| kWp | A year | August | January |
|---|---|---|---|
| 5 | 6,549 | 800 | 225 |
| 10 | 13,098 | 1,600 | 450 |
| 15 | 19,647 | 2,400 | 675 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Yachmennoye6 km1,317 kWh/kWp
- Vladislavovka7 km1,296 kWh/kWp
- Petrovo7 km1,318 kWh/kWp
- L’vovo7 km1,305 kWh/kWp
- Uzlovoye9 km1,301 kWh/kWp
- Primorskyi10 km1,291 kWh/kWp
All places: Kerchenskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.