Solar power plant in Primorskyi, Feodosiiskyi Raion, Autonomous Republic of Crimea

Primorskyi: 1,291 kWh per kWp a year, tilt 35° 3° west of south (PVGIS). 0.5% above the oblast median (1,284). #30 of 113 in the rayon, #453 of 1025 in the oblast.

Feodosiya, the rayon centre, is 12 km away. 6 m above sea level. 12 km away: Feodosiya, the nearest bigger centre, 1,277 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 279 km. 8.30 m between rows, pitch 12.22 m (latitude 45.1°).

Yield of 1 kWp
1,291kWh/year
Tilt
35°3° west of south
10 kW
12,906kWh/year
Row pitch
12.22m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Primorskyi

The designer opens with this place’s coordinates, latitude 45.1° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 279 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan67Feb103Mar130Apr146May147Jun155Jul158Aug131Sep100Oct60Nov46Dec

August: 158 kWh/kWp, December: 46 — 3.4 times less.

November: 60 against 63 in the oblast, 4.8% less.

Primorskyi: plants, kWh
kWpA yearAugustDecember
56,453790230
1012,9061,580460
1519,3592,370690

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Feodosiiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources