Solar plant: site data
Solar power plant in Petrovo, Kerchenskyi Raion, Autonomous Republic of Crimea
Petrovo: 1,318 kWh per kWp a year, tilt 35° 4° west of south (PVGIS). 2.6% above the oblast median (1,284). #19 of 71 in the rayon, #221 of 1025 in the oblast.
Kerch, the rayon centre, is 75 km away. 26 m above sea level. 25 km away: Feodosiya, the nearest bigger centre, 1,277 — 3.2% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 275 km. 8.36 m between rows, pitch 12.28 m (latitude 45.2°).
- Yield of 1 kWp
- 1,318kWh/year
- Tilt
- 35°4° west of south
- 10 kW
- 13,175kWh/year
- Row pitch
- 12.28m · GCR 0.39
- T_min
- -27 °Cregion V, Crimean Mountains
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Petrovo
The designer opens with this place’s coordinates, latitude 45.2° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 275 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 160 kWh/kWp, January: 46 — 3.5 times less.
June: 150 against 143 in the oblast, 4.9% more.
| kWp | A year | August | January |
|---|---|---|---|
| 5 | 6,588 | 800 | 230 |
| 10 | 13,175 | 1,600 | 460 |
| 15 | 19,763 | 2,400 | 690 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Yachmennoye3 km1,317 kWh/kWp
- Semisotka3 km1,319 kWh/kWp
- Kamenskoye6 km1,312 kWh/kWp
- L’vovo6 km1,305 kWh/kWp
- Frontovoye7 km1,310 kWh/kWp
- Batal’noye7 km1,329 kWh/kWp
All places: Kerchenskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.