Spain: solar plant site data
Solar power plant in Telde, Spain: yield, tilt angle and row spacing
Telde: 1,743 kWh per kWp a year at the optimal tilt of 26°, 4° west of south (PVGIS). 7.9% above the median of the main cities of Spain (1,615). #8 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 56.4% more here.
Telde is in the province of Las Palmas, Canary Islands. Population 123,265 (GeoNames). 160 m above sea level. 12 km away: Las Palmas de Gran Canaria, the nearest bigger city, 1,611 kWh/kWp — 8.2% more here. 2.95 m between rows, pitch 7.25 m, GCR 0.66 (latitude 28.0°).
- Yield of 1 kWp
- 1,743kWh/year
- Tilt
- 26°4° west of south
- 10 kW
- 17,428kWh/year
- Row pitch
- 7.25m · GCR 0.66
- Rank in the country
- 8of 147 cities
Ground frame designer
A ground frame for a solar plant: Telde
Latitude 28.0°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 170 kWh/kWp, November: 121 — 1.4 times less.
November: 121 against the median of 103 for the main cities of Spain, 17.5% more.
| kWp | A year | August | November |
|---|---|---|---|
| 5 | 8,714 | 850 | 605 |
| 10 | 17,428 | 1,700 | 1,210 |
| 15 | 26,142 | 2,550 | 1,815 |
Snow and wind loads
Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.
The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.
Nearby cities
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation, population and divisions (changed)
- Where to take snow and wind loads from: CTE DB SE-AE
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.