Spain: solar plant site data

Solar power plant in Arona, Spain: yield, tilt angle and row spacing

Arona: 1,576 kWh per kWp a year at the optimal tilt of 26°, 20° east of south (PVGIS). 2.4% below the median of the main cities of Spain (1,615). #106 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 41.5% more here.

Arona is in the province of Santa Cruz de Tenerife, Canary Islands. Population 78,614 (GeoNames). 632 m above sea level. 56 km away: San Cristóbal de La Laguna, the nearest bigger city, 1,760 kWh/kWp — 10.4% less here. 2.97 m between rows, pitch 7.27 m, GCR 0.66 (latitude 28.1°).

Yield of 1 kWp
1,576kWh/year
Tilt
26°20° east of south
10 kW
15,763kWh/year
Row pitch
7.27m · GCR 0.66
Rank in the country
106of 147 cities

Ground frame designer

A ground frame for a solar plant: Arona

Latitude 28.1°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

118Jan111Feb141Mar130Apr139May135Jun167Jul163Aug127Sep120Oct107Nov117Dec

July: 167 kWh/kWp, November: 107 — 1.6 times less.

December: 117 against the median of 103 for the main cities of Spain, 13.6% more.

Arona: plants, kWh
kWpA yearJulyNovember
57,882835535
1015,7631,6701,070
1523,6452,5051,605

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.