Solar power plant in Sabadell, Spain: yield, tilt angle and row spacing

Sabadell: 1,590 kWh per kWp a year at the optimal tilt of 38°, 2° west of south (PVGIS). 1.6% below the median of the main cities of Spain (1,615). #97 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 42.7% more here.

Sabadell is in the province of Barcelona, Catalonia. Population 211,734 (GeoNames). 187 m above sea level. 8 km away: Terrassa, the nearest bigger city, the same 1,584 kWh/kWp. 7.35 m between rows, pitch 11.12 m, GCR 0.43 (latitude 41.5°).

Yield of 1 kWp
1,590kWh/year
Tilt
38°2° west of south
10 kW
15,901kWh/year
Row pitch
11.12m · GCR 0.43
Rank in the country
97of 147 cities

Ground frame designer

A ground frame for a solar plant: Sabadell

Latitude 41.5°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

115Jan114Feb140Mar141Apr153May152Jun159Jul153Aug133Sep120Oct104Nov106Dec

July: 159 kWh/kWp, November: 104 — 1.5 times less.

September: 133 against the median of 143 for the main cities of Spain, 7.0% less.

Sabadell: plants, kWh
kWpA yearJulyNovember
57,951795520
1015,9011,5901,040
1523,8522,3851,560

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.