Spain: solar plant site data
Solar power plant in Rubí, Spain: yield, tilt angle and row spacing
Rubí: 1,568 kWh per kWp a year at the optimal tilt of 38°, 1° west of south (PVGIS). 3.0% below the median of the main cities of Spain (1,615). #114 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 40.7% more here.
Rubí is in the province of Barcelona, Catalonia. Population 72,987 (GeoNames). 145 m above sea level. 5 km away: Sant Cugat del Vallès, the nearest bigger city, 1,552 kWh/kWp — 1.0% more here. 7.33 m between rows, pitch 11.10 m, GCR 0.43 (latitude 41.5°).
- Yield of 1 kWp
- 1,568kWh/year
- Tilt
- 38°1° west of south
- 10 kW
- 15,675kWh/year
- Row pitch
- 11.10m · GCR 0.43
- Rank in the country
- 114of 147 cities
Ground frame designer
A ground frame for a solar plant: Rubí
Latitude 41.5°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 159 kWh/kWp, November: 102 — 1.6 times less.
September: 129 against the median of 143 for the main cities of Spain, 9.8% less.
| kWp | A year | July | November |
|---|---|---|---|
| 5 | 7,838 | 795 | 510 |
| 10 | 15,675 | 1,590 | 1,020 |
| 15 | 23,513 | 2,385 | 1,530 |
Snow and wind loads
Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.
The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.
Nearby cities
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation, population and divisions (changed)
- Where to take snow and wind loads from: CTE DB SE-AE
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.