Spain: solar plant site data

Solar power plant in Puertollano, Spain: yield, tilt angle and row spacing

Puertollano: 1,617 kWh per kWp a year at the optimal tilt of 35°, 5° east of south (PVGIS). Exactly the median of the main cities of Spain (1,615). #72 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 45.1% more here.

Puertollano is in the province of Ciudad Real, Castilla–La Mancha. Population 51,842 (GeoNames). 701 m above sea level. 37 km away: Ciudad Real, the nearest bigger city, 1,638 kWh/kWp — 1.3% less here. 5.96 m between rows, pitch 9.88 m, GCR 0.48 (latitude 38.7°).

Yield of 1 kWp
1,617kWh/year
Tilt
35°5° east of south
10 kW
16,165kWh/year
Row pitch
9.88m · GCR 0.48
Rank in the country
72of 147 cities

Ground frame designer

A ground frame for a solar plant: Puertollano

Latitude 38.7°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

108Jan113Feb136Mar139Apr153May154Jun167Jul165Aug143Sep129Oct105Nov104Dec

July: 167 kWh/kWp, December: 104 — 1.6 times less.

April: 139 against the median of 143 for the main cities of Spain, 2.8% less.

Puertollano: plants, kWh
kWpA yearJulyDecember
58,083835520
1016,1651,6701,040
1524,2482,5051,560

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.