Spain: solar plant site data

Solar power plant in Toledo, Spain: yield, tilt angle and row spacing

Toledo: 1,633 kWh per kWp a year at the optimal tilt of 36°, 2° east of south (PVGIS). 1.1% above the median of the main cities of Spain (1,615). #54 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 46.6% more here.

Toledo is in the province of Toledo, Castilla–La Mancha. Population 86,526 (GeoNames). 533 m above sea level. 47 km away: Parla, the nearest bigger city, 1,647 kWh/kWp — 0.8% less here. 6.46 m between rows, pitch 10.33 m, GCR 0.46 (latitude 39.9°).

Yield of 1 kWp
1,633kWh/year
Tilt
36°2° east of south
10 kW
16,331kWh/year
Row pitch
10.33m · GCR 0.46
Rank in the country
54of 147 cities

Ground frame designer

A ground frame for a solar plant: Toledo

Latitude 39.9°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

107Jan117Feb140Mar145Apr155May153Jun168Jul165Aug148Sep131Oct106Nov99Dec

July: 168 kWh/kWp, December: 99 — 1.7 times less.

December: 99 against the median of 103 for the main cities of Spain, 3.9% less.

Toledo: plants, kWh
kWpA yearJulyDecember
58,166840495
1016,3311,680990
1524,4972,5201,485

Fixed tilt facing south

What a table yields at another tilt than the optimal 36° — for roofs and frames with a standard slope.

Toledo: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
36° (optimum)1,633—
15°1,547−5.3%
30°1,626−0.5%
45°1,619−0.9%
90°1,074−34.2%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.