Solar power plant in Móstoles, Spain: yield, tilt angle and row spacing
Móstoles: 1,643 kWh per kWp a year at the optimal tilt of 37°, 4° east of south (PVGIS). 1.7% above the median of the main cities of Spain (1,615). #48 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 47.5% more here.
Móstoles is in Community of Madrid. Population 207,095 (GeoNames). 667 m above sea level. 17 km away: Madrid, the nearest bigger city, 1,620 kWh/kWp — 1.4% more here. 6.76 m between rows, pitch 10.58 m, GCR 0.45 (latitude 40.3°).
- Yield of 1 kWp
- 1,643kWh/year
- Tilt
- 37°4° east of south
- 10 kW
- 16,427kWh/year
- Row pitch
- 10.58m · GCR 0.45
- Rank in the country
- 48of 147 cities
Ground frame designer
A ground frame for a solar plant: Móstoles
Latitude 40.3°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 168 kWh/kWp, November: 103 — 1.6 times less.
September: 149 against the median of 143 for the main cities of Spain, 4.2% more.
| kWp | A year | July | November |
|---|---|---|---|
| 5 | 8,214 | 840 | 515 |
| 10 | 16,427 | 1,680 | 1,030 |
| 15 | 24,641 | 2,520 | 1,545 |
Snow and wind loads
Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.
The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.
Nearby cities
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation, population and divisions (changed)
- Where to take snow and wind loads from: CTE DB SE-AE
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.