Spain: solar plant site data

Solar power plant in Córdoba, Spain: yield, tilt angle and row spacing

Córdoba: 1,651 kWh per kWp a year at the optimal tilt of 35°, 1° west of south (PVGIS). 2.2% above the median of the main cities of Spain (1,615). #35 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 48.2% more here.

Córdoba is in the province of Córdoba, Andalusia. Population 325,708 (GeoNames). 117 m above sea level. 120 km away: Seville, the nearest bigger city, 1,672 kWh/kWp — 1.2% less here. 5.75 m between rows, pitch 9.67 m, GCR 0.49 (latitude 37.9°).

Yield of 1 kWp
1,651kWh/year
Tilt
35°1° west of south
10 kW
16,509kWh/year
Row pitch
9.67m · GCR 0.49
Rank in the country
35of 147 cities

Ground frame designer

A ground frame for a solar plant: Córdoba

Latitude 37.9°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

115Jan116Feb140Mar142Apr155May156Jun166Jul164Aug146Sep131Oct111Nov110Dec

July: 166 kWh/kWp, December: 110 — 1.5 times less.

November: 111 against the median of 103 for the main cities of Spain, 7.8% more.

Córdoba: plants, kWh
kWpA yearJulyDecember
58,255830550
1016,5091,6601,100
1524,7642,4901,650

Fixed tilt facing south

What a table yields at another tilt than the optimal 35° — for roofs and frames with a standard slope.

Córdoba: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
35° (optimum)1,651—
15°1,572−4.8%
30°1,645−0.3%
45°1,632−1.2%
90°1,060−35.8%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.