Spain: solar plant site data

Solar power plant in Seville, Spain: yield, tilt angle and row spacing

Seville: 1,672 kWh per kWp a year at the optimal tilt of 35°, 1° west of south (PVGIS). 3.5% above the median of the main cities of Spain (1,615). #29 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 50.0% more here.

Seville is in the province of Seville, Andalusia. Population 686,741 (GeoNames). 16 m above sea level. 390 km away: Madrid, the nearest bigger city, 1,620 kWh/kWp — 3.2% more here. 5.62 m between rows, pitch 9.54 m, GCR 0.50 (latitude 37.4°).

Yield of 1 kWp
1,672kWh/year
Tilt
35°1° west of south
10 kW
16,715kWh/year
Row pitch
9.54m · GCR 0.50
Rank in the country
29of 147 cities

Ground frame designer

A ground frame for a solar plant: Seville

Latitude 37.4°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

120Jan119Feb141Mar144Apr157May155Jun165Jul163Aug147Sep133Oct114Nov113Dec

July: 165 kWh/kWp, December: 113 — 1.5 times less.

November: 114 against the median of 103 for the main cities of Spain, 10.7% more.

Seville: plants, kWh
kWpA yearJulyDecember
58,358825565
1016,7151,6501,130
1525,0732,4751,695

Fixed tilt facing south

What a table yields at another tilt than the optimal 35° — for roofs and frames with a standard slope.

Seville: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
35° (optimum)1,672—
15°1,593−4.7%
30°1,667−0.3%
45°1,651−1.2%
90°1,069−36.0%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.